Chapter 3: Site Preparation

For the NCR 7870 to operate efficiently and safely, the selected installation site must meet certain requirements. Ensuring that these conditions are met and maintained will protect the 7870 from unnecessary wear and potential damage as well as easing installation. This chapter covers

Getting Started

About Site Preparation

Customer Responsibilities

Environmental Requirements

Checkstand Power and Wiring Considerations

Checkstand Considerations

Cable Lengths and Hole Sizes

7870 Dimensions

Page 43
Image 43
NCR 7870 manual Site Preparation