Customer Responsibilities
The customer must do or provide the following.
•When required by NCR, provide the NCR Customer Services Representative with appropriate drawings that indicate
•location of equipment,
•site wiring (power and signal, paths, and lengths),
•Location of other equipment capable of generating large amounts of electrical noise, electromagnetic interference, heat, and so on.
•Provide floor coverings and environmental systems that prevent static electricity
•Provide and install necessary power distribution boxes, conduits, grounds, lightening arrestors, and associated hardware.
•Make sure clear space and environmental requirements of the unit are met.
•Make all building alterations necessary to meet wiring and other site requirements.
•Make sure all applicable codes, regulations, and laws (including, but not limited to, electrical, building, safety, and health) are met.
•Provide and install all communication cables, wall jacks, special connectors, and associated hardware.
•Provide and install auxiliary power or other equipment as required.