5-16 Chapter 5: Calibration

Securing the Calibration Switch

Most countries require that the Calibration Switch and Scale Board be secured before a unit can be put into operation.

Some states and jurisdictions permit the use of the Audit Trail in place of the physical seals. Check with your local inspector or governmental agency about using the Audit Trail.

This procedure begins with the unit already disassembled with Tower Cabinet in place and access to the Calibration Switch.

Prior Steps

Calibration Switch accessible. See Section 2: Accessing the Calibration Switch.

Tools

Needle-nosed Pliers

 

Lead/Wire Seal

P/N: 603-8001097

Lead/Wire Seal Press

P/N: 603-9000157

Film/Paper Seal

Obtain locally – must meet local government

 

requirements

Instructions

1.Install Scale Board Shield.

a)Position Shield so it encloses edge of Load Cell Shield, if present.

b)Insert tabs of Shield into slots.

c)Place Shield into position and attach thumbscrew. Tighten with pliers if necessary.

2.Attach seal and/or wire tag to control access to Calibration Switch.

Page 102
Image 102
NCR 7870 manual Securing the Calibration Switch, Prior Steps