Chapter 4: Installation

Getting Started

This chapter describes the installation process for the NCR 7870. Before installation, prepare the site in accordance to the requirements in Chapter 2 – Site Preparation.

The first step is to perform an inspection to verify that the unit and checkstand are ready.

Reporting a Damaged Unit

Upon receiving an NCR 7870, inspect the shipping for damage. If the carton is damaged, open it in the presence of the shipping carrier before signing the bill of lading. If the scanner/scale has been damaged due to shipping, notify the carrier and an NCR representative. If the unit was not purchased directly from NCR, notify your supplier.

What’s in the Box

Unpack the unit according to the instructions on the box. Inventory the contents to ensure you have received the following components.

NCR 7870

Power Cord

Top Plate

Documentation

Country Language Specific

• Metal Foil Stamping Plate

 

IEC Class 1 Laser Labels

 

(200x Model International

 

(International Units)

 

Units)

Power Cord Documents

• Interface Cable (when cable

 

(International Units)

 

feature requested with order)

Page 75
Image 75
NCR 7870 manual Reporting a Damaged Unit, What’s in the Box