Upgrading Your Modular Server 8-5

PREPARATION FOR INSTALLATION/REMOVAL

To install or remove an optional device in/from the modular server, you should first remove the modular server from the Module Enclosure.

IMPORTANT:

„Remove the target modular server only. Do not remove any other blank cover or modular server from another slot. Be sure to install or remove the modular server one by one.

„Put the removed modular server in the following place.

Place with little dust

Place with less humidity

Place that satisfies the requirements for anti-static measures

Place where intense vibration or shock may not be generated

Place where intense magnetic field is not generated