6-6 Maintenance

7.Follow the guide line shown at the bottom of the screen, and press the Esc key. The [Enduser Menu] below is displayed.

TeDoLi (TEst & Diagnosis On Linux) Ver001.00 (Build020901.1.1m)

Enduser Menu

<Test Result>

<Device List> <Log Info> <Option> <Reboot>

Please choose a function by the arrow key and push Enter key.

<Test Result> Shows the diagnostics completion screen of the above diagnostics. <Device List> Shows a list of connected devices.

<Log Info> Shows the log information of the diagnostics. Log information can be saved.

To save it, connect a FAT formatted removable media, and select <Save(F)>.

<Option> Optional features can be used from this menu.

<Reboot> Reboots the system.

8.Select <Reboot> in the [Enduser Menu] above.

The modular server restarts and the system is started from the NEC EXPRESSBUILDER.

9.Exit the NEC EXPRESSBUILDER, and remove the DVD from the optical disk drive.

10.Power off the modular server.

11.Reconnect LAN between the switch kit and the modular server that have been disconnected in Step 2.

This completes the system diagnostics.