(1) PITCH VALVE & ETR CHECK

PITCH VALVE & ETR CHECK

PITCH VALVE

DOWN

UP VALVE

ON

ETR UP VALVE

ON

DOWN VALVE

ON

ETR DOWN VALVE

ON

PITCH ETR

F0H

UP LIMIT SW

ON

DOWN LIMIT SW

ON

PITCH VOLUME

46H

PRESS TEST BUTTON TO EXIT

FIG. 9. 3 f b PITCH VALVE & ETR CHECK Screen

TEST PROCEDURE

1In the VALVE TEST MENU, press the SERVICE Button and bring the arrow to PITCH VALVE & ETR CHECK.

2Press the TEST Button to have the PITCH VALVE TEST screen appear.

3Turn the Handlebars to the right to raise the Ride.

4Turn the Handlebars to the left to lower the Ride.

5Position the Handlebars in the center to stop the Ride.

6

Gripping the Throttle Lever during 3 ~ 5 above increases the air pressure and releasing

 

the Throttle Lever decreases the air pressure.

7

During 3 ~ 6 , check the functioning of each Air Valve and Limit SW.

8Press the TEST Button to return to the VALVE TEST Menu.

9Choose EXIT and press the TEST Button to return to the Game Test Menu screen.

49www.seuservice.com

Page 58
Image 58
Sega WaveRunner owner manual B Pitch Valve & ETR Check Screen