
NDIR Gas Analyzer | Operation | |
|
|
|
Operation
4.1 Preparation for operation
Tube and wiring check
•
•
4.2Warm-up Operation and Normal Operation
(1)Operation Procedure
1.Turn ON the power switch on the left side when facing the front panel of the analyzer unit. The measurement screen will appear on the front display panel in a few seconds.
2.The instrument
Note: During the
3.During the warm up period, you can set the various instrument parameters as described in Section 6: Setting and Calibration.
4.After the
5.After calibrating the analyzer, introduce sample gas into the analyzer and allow the lines to purge before accepting the measurement value.
Teledyne Analytical Instruments | 25 |