Teledyne 7500ZA operating instructions Measuring Unit Configuration Pipe Cell

Models: 7500ZA

1 126
Download 126 pages 9.92 Kb
Page 95
Image 95

NDIR Gas Analyzer

Maintenance

 

 

 

7.4.1.1PIPE CELL REMOVAL (SEE FIG. 7-1)

1.Stop all gas flow. If necessary, purge the pipe cell thoroughly with zero gas.

2.Turn OFF the power switch and disconnect the AC power cord.

3.Remove the cover (six screws).

4.Remove the tube connected to the pipe cell.

5.Loosen and remove the screw (No. 7) holding the cell retainer (No. 11) at both ends of the pipe cell.

6.Remove the cell from the assembly and unscrew the infrared transmission window (No. 14) at both ends.

7.For assembly, reverse the disassembly procedure.

Figure 7-1: Measuring Unit Configuration (Pipe Cell)

Teledyne Analytical Instruments

79

Page 95
Image 95
Teledyne 7500ZA operating instructions Measuring Unit Configuration Pipe Cell