NDIR Gas Analyzer | Instalation |
|
|
Installation
Installation of the Model 7500ZA NDIR Analyzer includes:
∙Unpacking
∙Mounting
∙Gas connections
∙Electrical connections
∙Calibration
DANGER: THIS UNIT IS NOT AN
CAUTION: ENTRUST THE INSTALLATION, MOVEMENT OR RE- INSTALLATION TO A SPECIALIST OR THE SUPPLIER. A POOR INSTALLATION MAY CAUSE ACCIDENTAL TIPOVER, ELECTRIC SHOCK, FIRE, INJURY, ETC.
•The gas analyzer is heavy. It should be installed with utmost care. Otherwise, it may tip over or fall, causing accident or injury.
•For lifting the gas analyzer, be sure to wear protective gloves. Using bare hands may result in injury.
•This unit should be installed in an environment conforming to the conditions noted in the instruction manual. Otherwise, electric shock, fire or other malfunction of the unit may occur.
•During installation, care should be taken to keep the unit free from entry of chips, dust, and debris. Otherwise, it may cause fire, trouble or malfunction of the unit.
The analyzer is shipped with all the materials you need to install and prepare the system for operation. Carefully unpack the transmitter and inspect it for damage. Immediately report any damage to the shipping agent.
Teledyne Analytical Instruments | 7 |