Adjust the minimum position potentiometer to allow the minimum amount of outdoor air, as required by local codes, to enter the building. Make minimum position adjustments with at least 10_F temperature difference between the outdoor and return-air temperatures.

To determine the minimum position setting, perform the following procedure:

1.Calculate the appropriate mixed air temperature using the following formula:

(TO x 100OA ) + (TR x 100RA ) =TM

TO = Outdoor-Air Temperature

OA = Percent of Outdoor Air

TR = Return-Air Temperature

RA = Percent of Return Air

TM = Mixed-Air Temperature

As an example, if local codes require 10% outdoor air during occupied conditions, outdoor-air temperature is 60_F, and return-air temperature is 75_F.

(60 x .10) + (75 x .90) = 73.5_F

2.Disconnect the supply air sensor from terminals T and T1.

3.Ensure that the factory-installed jumper is in place across terminals P and P1. If remote damper positioning is being used, make sure that the terminals are wired according to Fig. 73 and that the minimum position potentiometer is turned fully clockwise.

4.Connect 24 vac across terminals TR and TR1.

5.Carefully adjust the minimum position potentiometer until the measured mixed air temperature matches the calculated value.

6.Reconnect the supply air sensor to terminals T and T1.

Remote control of the EconoMi$er IV damper is desirable when requiring additional temporary ventilation. If a field-supplied remote potentiometer (Honeywell part number S963B1128) is wired to the EconoMi$er IV controller, the minimum position of the damper can be controlled from a remote location.

To control the minimum damper position remotely, remove the factory-installed jumper on the P and P1 terminals on the EconoMi$er IV controller. Wire the field-supplied potentiometer to the P and P1 terminals on the EconoMi$er IV controller. (See Fig. 73.)

Damper Movement

Damper movement from full open to full closed (or vice versa) takes 2-1/2minutes.

Thermostats

The EconoMi$er IV control works with conventional thermostats that have a Y1 (cool stage 1), Y2 (cool stage 2), W1 (heat stage 1), W2 (heat stage 2), and G (fan). The EconoMi$er IV control does not support space temperature sensors. Connections are made at the thermostat terminal connection board located in the main control box.

Demand Control Ventilation (DCV)

When using the EconoMi$er IV for demand controlled ventilation, there are some equipment selection criteria which should be considered. When selecting the heat capacity and cool capacity of the equipment, the maximum ventilation rate must be evaluated for design conditions. The maximum damper position must be calculated to provide the desired fresh air.

Typically the maximum ventilation rate will be about 5 to 10% more than the typical cfm required per person, using normal outside air design criteria.

A proportional anticipatory strategy should be taken with the following conditions: a zone with a large area, varied occupancy, and equipment that cannot exceed the required ventilation rate at design conditions. Exceeding the required ventilation rate means the equipment can condition air at a maximum ventilation rate that is greater than the required ventilation rate for maximum occupancy. A proportional-anticipatory strategy will cause the fresh air supplied to increase as the room CO2 level increases even though the CO2 setpoint has not been reached. By the time the CO2 level reaches the setpoint, the damper will be at maximum ventilation and should maintain the setpoint.

In order to have the CO2 sensor control the economizer damper in this manner, first determine the damper voltage output for minimum or base ventilation. Base ventilation is the ventilation required to remove contaminants during unoccupied periods. The following equation may be used to determine the percent of outside air entering the building for a given damper position. For best results there should be at least a 10 degree difference in outside and return-air temperatures.

(TO x 100OA ) + (TR x 100RA ) =TM

TO = Outdoor-Air Temperature

OA = Percent of Outdoor Air

TR = Return-Air Temperature

RA = Percent of Return Air

TM = Mixed-Air Temperature

Once base ventilation has been determined, set the minimum damper position potentiometer to the correct position.

48TC

63

Image 63
Contents Safety Considerations Table of ContentsUnit Arrangement and Access GeneralWhat to do if you smell gas Seasonal Maintenance Routine MaintenanceSupply FAN Blower Section Supply Fan Belt-DriveManual Outside Air Hood Screen Supply-Fan Pulley Adjustment Bearings Adjustable-Pitch Pulley on MotorCondenser Coil Coil Maintenance and Cleaning RecommendationPeriodic Clean Water Rinse CoolingRoutine Cleaning of Evaporator Coil Sufaces Routine Cleaning of Novation Condenser Coil SurfacesRefrigerant System Pressure Access Ports Puronr R-410A RefrigerantRefrigerant Charge Seatcore Cooling Charging Charts D08 Cooling Charging ChartsCooling Charging Charts D12 Cooling Charging Charts D14 Circuit a Cooling Charging Charts D14 Circuit B Problem Cause Remedy Cooling Service AnalysisCompressors Condenser-Fan Adjustment D08-D12 sizeCondenser-Fan Adjustment D14 size Troubleshooting Cooling SystemDuty Cycle Non-Powered TypeUnit-Powered Type Convenience OutletsSmoke Detectors Typical Supply Air Smoke Detector Sensor Location Smoke Detector LocationsFiop Smoke Detector Wiring and Response Completing Installation of Return Air Smoke SensorSensor and Controller Tests Sensor Alarm TestSensor Alarm Test Procedure Controller Alarm TestTo Configure the Dirty Sensor Test Operation Controller Alarm Test ProcedureDirty Controller Test Procedure Dirty Sensor Test ProcedureDirty Sensor Test Using an SD-TRK4 Detector CleaningSD-TRK4 Remote Alarm Test Procedure Remote Test/Reset Station Dirty Sensor TestTroubleshooting Compressor Protection Protective DevicesGAS Heating System Control CircuitFuel Types and Pressures Combustion-Air Blower Flue Gas PassagewaysMain Burners Burners and IgnitersCleaning and Adjustment Check Unit Operation and Make Necessary AdjustmentsLimit Switch LED Error Code Description LED Indication Error Code DescriptionBurner Ignition Gas Valve Orifice ReplacementOutputs Integrated Gas Control IGC Board IGC ConnectionsElevation Orifice SizesAltitude Compensation Orifice Carrier Drill Drill Size Part NumberProblem Cause Remedy Troubleshooting Heating SystemMinimum Heating Entering Air Temperature Heating Service AnalysisIGC IGC Board LED Alarm CodesCondenser Coil Service Repairing Novation Condenser Tube LeaksReplacing Novation Condenser Coil PREMIERLINKt Control Typical PremierLinkt System Control Wiring Diagram Temp Resistance 55 Space Temperature Sensor WiringSpace Sensor Mode TB1 Terminal Field Connection Input SignalPremierLink Sensor Usage 56 Internal Connections Thermostat ModeLctb Indoor CO2 Sensor 33ZCSENCO2 Connections PremierLink Filter Switch Connection Color Code Recommendations Signal Type CCN BUS Wire CCN Plug PIN Color NumberRTU-MP Control System Recommended CablesRTU-MP Multi-Protocol Control Board Typical RTU-MP System Control Wiring Diagram Type of I/O Connection PIN Name Numbers Inputs Configurable InputsRTU-MP Controller Inputs and Outputs Point NameRTU-MP T-55 Sensor Connections Space Temperature SPT SensorsRTU-MP / Indoor CO2 Sensor 33ZCSENCO2 Connections Connecting Discrete Inputs Power Exhaust outputCommunication Wiring Protocols RTU-MP Troubleshooting LEDs BACview6 Handheld ConnectionsTroubleshooting Alarms BACnet MS/TP AlarmsModule Status Report Modstat Example Code Name Meaning Basic Protocol TroubleshootingModbus Manufacture DateEconoMi$er IV Component Locations ECONOMI$ER SystemsEconoMi$er IV Wiring EconoMi$er EconoMi$er IV Input/Output LogicInputs Outputs Outdoor Dry Bulb Changeover Supply Air Temperature SAT SensorOutdoor Air Lockout Sensor EconoMi$er IV Control ModesOutdoor Enthalpy Changeover Differential Dry Bulb ControlExhaust Setpoint Adjustment Indoor Air Quality IAQ Sensor InputMinimum Position Control Damper Movement ThermostatsDemand Control Ventilation DCV CO2 Sensor Configuration CO2 Sensor Standard SettingsAnalog CO2 Differential Enthalpy DCV Demand Controlled Ventilation and Power ExhaustEconoMi$er IV Sensor Usage EconoMi$er IV PreparationSupply-Air Sensor Input Wiring DiagramsEconoMi$er IV Troubleshooting Completion DCV Minimum and Maximum Position48TC Typical Unit Wiring Diagram Power D08, 208/230-3-60 48TC Typical Unit Wiring Diagram Control D08, 208/230-3-60 Gas Piping PRE-START-UPSTART-UP, General Unit PreparationOutdoor-Air Inlet Screens Internal WiringRefrigerant Service Ports Return-Air FiltersPerform System Check-Out Field Service TestSTART-UP, RTU-MP Control Ventilation Continuous FanConfiguration Heating Lockout Temp Cooling/Econ SAT Low SetptCooling Lockout Temp Heating Heating SAT High SetptIAQ High Reference @ 20mA Power Exhaust SetptT55/56 Override Duration IAQ Low Reference @ 4mAOperating Sequences PremierLinkt Control Supplemental Controls48TC 48TC Number Stages Economizer Available Cooling Stages48TC 48TC Linkage Modes Rooftop Mode Value Linkage ModeScheduling Loadshed Command Gas and Electric Heat UnitsAlways Occupied Default Occupancy RTU-MP Sequence of OperationIndoor Fan BACnet ScheduleBAS On/Off DI On/OffIndoor Air Quality Power ExhaustFastener Torque Values EconomizerTorque Values Position Number Typical Designates Appendix I. Model Number SignificanceModel Number Nomenclature Serial Number FormatAppendix II. Physical Data Physical Data12.5TONS Natural Gas Heat, Liquid Propane Heat Heat Anticipator Setting AmpsPhysical Data Heating 12.5TONS 48TC**08 48TC**12 48TC**14 Gas ConnectionCFM RPM BHP Appendix III. FAN Performance579 FAN PerformanceRPM BHP 48TC**14Unit MOTOR/DRIVE Motor Pulley Turns Open Combo Pulley AdjustmentElectrical Information Type DISC. Size Unit Combustion PowerMCA/MOCP Determination no C.O. or Unpwrd C.O NOM IFM FAN Motor Exhaust No P.EAppendix IV. Wiring Diagram List Wiring DiagramsSize Voltage Control Power Catalog No 48TC-3SM Appendix V. Motormaster Sensor LocationsPreliminary Information Unit START-UP Checklist