Lethal Exhaust Gases

Safety precautions should be followed at all times when installing or operating this equipment. Failure to read and understand the Safety Messages and Installation Instructions could result in injury to yourself and others.

This genset Installation Manual has been developed to provide

NOTEcomplete instructions for the safe implementation of MQ Power Gensets for field installation. Depending on the power plant you have selected, please refer to the

engine manufacturers instructions for data relative to its safe operations.

Before installing any MQ Power Genset, ensure that all authorized personnel have read and understands all installation or operating instructions referenced in this manual.

SAFETY MESSAGE ALERT SYMBOLS

The three (3) Safety Messages shown below will inform you about potential hazards that could injure you or others. The Safety Messages specifically address the level of exposure to the operator, and are preceded by one of three words: DANGER, WARNING, or CAUTION.

You WILL be KILLED or SERIOUSLY INJURED

if you DO NOT follow these directions.

You CAN be KILLED or SERIOUSLY INJURED if

you DO NOT follow these directions.

Engine exhaust gases contain poisonous carbon monoxide. This gas is colorless and odorless, and can cause death if inhaled. NEVER operate this equipment in a confined area or enclosed structure that does not provide ample free flow air.

Natural gas and liquid petroelum gas (LPG) can be also extremly dangerous if inhaled. They are odorless but a smell has been added to detect any leaks. IMMEDIATELY shut off the gas source if a leak is detected. If in an enclosed area, vacate the premises until the area is ventilated.

Explosive Fuel

Diesel fuel is extremely flammable, and its vapors can cause an explosion if ignited. DO NOT start the engine near spilled fuel or combustible fluids. DO NOT fill the fuel tank while the engine is running or hot. DO NOT overfill tank, since spilled fuel could ignite if it comes into contact with hot engine parts or sparks from the ignition system. Store fuel in

approved containers, in well-ventilated areas and away from sparks and flames. NEVER use fuel as a cleaning agent.

Natural gas and LPG are extremely flammable and will explode and catch fire if exposed to sparks or flame. NEVER smoke in any area where gases are stored or supplied. IMMEDIATELY shut off the gas source if a leak is detected. Be certain that the area is well ventilated before exposing it to any mechanical or electrical device that may emit heat or sparks.

Burn Hazards

Engine components can generate extreme heat. To prevent burns, DO NOT touch these areas while the engine is running or immediately after operation. NEVER operate the engine with heat shields or heat guards removed.

You CAN be INJURED if you DO NOT follow these directions.

Potential hazards associated with MQ Power Gensets field installation will be referenced with Hazard Symbols which appear throughout this manual, and will be referenced in conjunction with Safety Message Alert Symbols.

Rotating Parts

NEVER operate equipment with covers or guards removed. Keep fingers, hands, hair and clothing away from all moving parts to prevent injury.

PAGE 6 — INDUSTRIAL GENERATOR SETS — APPLICATION & INSTALLATION MANUAL — REV. #4 (09/07/07)

Image 6
Contents MQ Power Application & Installation ManualPage Heres HOW to GET Help Table of Contents Page Safety Message Alert Symbols Foryour Safety and the Safety of OthersSafety Message Alert Symbols Accidental StartingImportant Safety Instructions General SafetyImportant Safety Instructions General Safety RadiatorEmergencies Operation SafetyMaintenance Safety Always know the location of the nearest fire extinguisherBattery Safety Fire Protection Genset should be inspected regularly for fire hazardsLifting the Generator Set Always drain fuel prior to liftingIntroduction Always remember Safety FIRST!!! Safety involves twoIntroduction About This ManualOverview Application and InstallationInstallation ApplicationLocation Installation OverviewCold Climates and Derating Factors Outdoor LocationsGenset Sizing „ Static Uninterrupted Power Supplies UPSGenset Sizing Procedure Generator Set Sizing CalculationsStep Sequence Guidelines 765.7 Repeat steps a and b as necessary through all the worksheets Generator Set Sizing Calculations Select a Generator Set Establish the minimum size requiredRunning load should not be Genset Sizing Determining Load Characteristics Determining Load Characteristics LightingSingle-Phase Induction Motor Genset Sizing Determining Load Characteristics Three-Phase Induction MotorsCalculate SkVA as follows Full SkVA Determining Load CharacteristicsCalculate SkW as follows 100Three Phase Nema Motor Code Table 201Static UPS Synchronous MotorsVariable Frequency Drives Equation above Output kVA is the nameplate kVA capacityNoise Laws and Regulations Noise ConsiderationRadiator discharge air high frequency sound Noise Zones Peak DayComparison Chart dBA Environmental Considerations dBAAdding Additional Sound Sources Below estimates the noise level from multiple noise sourcesEffects of Distance Distance Effects on dBASee on page 32 for typical measures in reducing noise Reducing NoiseFollowing will help reduce structure-borne noise Following will help reduce airborne noiseAcoustic Material Reducing NoiseMounting on a Slab Floor Access to SetMounting Mounting on a Sub-Base Fuel TankMounting Foundation Mounting FoundationMountingthe Generator SET General InformationVibration Isolators Installation and Adjustment Procedure Mounting Vibration IsolatorsDiesel Fuel Mechanical Installation Fuel System DieselFuel System Installation Supply TankMechanical Installation Fuel System Diesel Diesel Fuel Supply Minimum Fuel Supply / Return Hose and Pipe SizesMechanical Installation Fuel System Gaseous Fuels Mechanical Installation Fuel System Gaseous Fuels ContaminantsGaseous Fuel Supply Pipe and Tube Sizing Natural GAS Schedule 40 Iron Pipe SizingTypical Pipe Schematic for Propane Vapor Distribution Mechanical Installation Fuel System Liquid Propane Schedule 40 Iron Pipe SizingFuel Storage Regulations Environmental ProtectionAdditional references include Mechanical Installation Exhaust System Exhaust System InstallationField Installing a Generator Exhaust System Mechanical Installation Exhaust System Condensation Trap Exhaust System Installation Reference Data Factory Recommended Engine Exhaust SilencersMQ Power Batteries Mechanical Installation Battery SystemPurpose of the Battery How BatteriesWorkMechanical Installation Battery System „ See the Battery Safety Instructions onEngine Starting System Preparation of Charged and Wet Batteries Mechanical Installation NEW BatteryNew Battery Installation Preparation of Dry Charged Charged and Moist BatteriesDry Charged Batteries Mechanical Installation NEW BatteryRemoving Old Battery Charged and Moist Batteries ActivationStep One 1 -Visual Inspection See Flow Chart, on next Battery System -TESTING BatteryBatteryTesting Step Three 3 Load ProcedureBattery System Batterytesting Chart Battery Testing ChartBattery System Charging Battery Battery StorageCharging LowWater-loss Batteries Battery System Battery Charger LC1224-500-2 Battery Charger Battery System Battery ChargerFC & FCA Battery Charger FC1224-10-2011U Battery ChargerBattery System Battery Charger Safety Battery Charger InstallationBattery Charger Safety Ventilation and Cooling Mechanical Installation -VENTILATION and CoolingEngine Cooling Vents and DuctsMechanical Installation -VENTILATION and Cooling LouversMechanical Installation Mounted Radiator Cooling Factory Mounted RadiatorVentilationMechanical Installation Mounted Radiator Cooling Mounted Radiator Cooling SystemRadiator Set Requirements Mechanical Installation Remote Radiator Cooling Remote Radiator Cooling optionalMechanical Installation Remote Radiator Cooling Remote Radiator CoolingMechanical Installation Hotwell Cooling Hot Well InstallationMechanical Installation Heat Exchanger Cooling Heat Exchanger19,200/60x8 = 40 gpm Coolant Treatment CoolantTreatmentCoolant Heaters Electrical Installation DC Controlwiring Control box contains the following „ Digital Control Module DC Control Wiring Control BOX Back PanelControl Box „ Control Box Back Panel ComponentsDC Controlwiring Control BOX Back Panel L3 3 PHGenerator Set Wire Diagram Transfer Switch AC Electrical ConnectionsAC Electrical Connections Connection Of Generator Leads For Correct Voltage OutputBreaker Electrical TerminationsMounted fuel tank is used, the electrical stub-up Line circuit breakerAC Electrical Connections System Grounding AC Electrical Connections System Grounding Pole ATSAC Electrical Connections Equipment Grounding Equipment GroundingElectrical Distribution System Electrical Distribution SystemPRE-START Preparation PRE-START Preparation Run the Generator SetAppendix Installation Checklist For MQ Power Industrial Generators Appendix MAIN-LINE Circuit BreakerAppendix MAIN-LINE Circuit Breaker Appendix Generator Specifications MQ Power Industrial Generator SpecificationsAppendix Generator Specifications MQ Power Industrial Generator Specifications Appendix Engine Specifications Appendix Engine Specifications MQP175IV MQP200IV MQP250IVGenerator Model MQP300IV MQP350IV MQP400IV Appendix Engine Specifications Generator Model MQP30GM MQP45GM MQP60GM MQP80GM MQP100GMAppendix Dimensions and Weights MQ Power Generator Dimensions & WeightsAppendix Dimensions Andweights MQ Power Generator Dimensions & WeightsHeres HOW to GET Help