AC ELECTRICAL CONNECTIONS — SYSTEM GROUNDING

AC WIRING

GeneratorVoltage Connections

The generator output voltage and maximum current rating are specified on the generator set nameplate. Line-to-neutral voltage is always the lower voltage shown and the line-to- line voltage is the higher rating.

The generators are available at the voltages shown in the wiring diagram of the genset. The genset is connected at the factory to produce a specified voltage per customer order.

Before shipping, the factory tests the generator set at the specified voltage.

Load Connections (Connecting the Load)

All loads are connected to the generator by bolting the stranded load wires to the appropriate terminals on the generator output circuit breaker. The terminals are marked for identification to indicate the line and neutral connections.

Load Balancing

When connecting loads to the generator set, balance the loads so the current flow from each line terminal is about the same. This is especially important if both single phase and three phase loads are connected. Unbalanced loading of a genset causes unbalanced phase voltages.

Any combination of 1Ø and 3Ø loading can be used as long as each line current is about the same, within 10% of the median value and no line current exceeds the nameplate rating of the generator. Check the current flow from each line after connections by observing the control panel ammeter.

Correct grounding in standby systems that are solidly grounded is a function of the

NOTE transfer switch equipment used (solid neutral or switched neutral).

Grounding

The following is a brief description of system and equipment grounding of permanently installed AC generators within a facility wiring system. It is important to follow the requirements of the local and county electrical codes.

System Grounding

System grounding is the intentional grounding of the neutral point of a wye-connected generator, the corner of a delta- connected generator, or the neutral point of one phase winding of a delta-connected generator, depending on the system voltage required in the application. It is common to ground the neutral point of a wye-connected generator and bring out the neutral (grounded circuit conductor) in a 3Ø four-wire system.

Acorner-grounded delta system has a grounded circuit conductor that is not a neutral and a "wild leg" that must be identified by orange color coding and connected to the middle pole of the 3Ø equipment.

System Grounding Methods

Solid Grounding

This method is typically used and required by the National Electrical Code (NEC) on all low voltage systems (600 volts and below) with a grounded circuit conductor (most often a neutral).

The system is grounded with a direct connection by a conductor (the grounding electrode conductor) with no intentional impedance to earth (grounding electrode).

Ungrounded

Ungrounded systems are special applications where no intention of connection is made between the AC generator system and earth. These systems are occasionally used on 3Ø three-wire systems (no grounded circuit conductor) operating at 600 volts or below, where continuity of power with one ground fault is required or desirable, and qualified service electricians are on site. An example would be a critical process industry.

PAGE 76 — INDUSTRIAL GENERATOR SETS — APPLICATION & INSTALLATION MANUAL — REV. #4 (09/07/07)

Image 76
Contents MQ Power Application & Installation ManualPage Heres HOW to GET Help Table of Contents Page Safety Message Alert Symbols Foryour Safety and the Safety of OthersSafety Message Alert Symbols Accidental StartingImportant Safety Instructions General SafetyImportant Safety Instructions General Safety RadiatorOperation Safety Maintenance SafetyEmergencies Always know the location of the nearest fire extinguisherBattery Safety Fire Protection Genset should be inspected regularly for fire hazardsLifting the Generator Set Always drain fuel prior to liftingAlways remember Safety FIRST!!! Safety involves two IntroductionIntroduction About This ManualApplication and Installation InstallationOverview ApplicationInstallation Overview Cold Climates and Derating FactorsLocation Outdoor Locations„ Static Uninterrupted Power Supplies UPS Genset Sizing ProcedureGenset Sizing Generator Set Sizing CalculationsStep Sequence Guidelines 765.7 Repeat steps a and b as necessary through all the worksheets Establish the minimum size required Generator Set Sizing Calculations Select a Generator SetRunning load should not be Determining Load Characteristics Lighting Genset Sizing Determining Load CharacteristicsSingle-Phase Induction Motor Three-Phase Induction Motors Genset Sizing Determining Load CharacteristicsCalculate SkVA as follows Determining Load Characteristics Calculate SkW as followsFull SkVA 100Three Phase Nema Motor Code Table 201Synchronous Motors Variable Frequency DrivesStatic UPS Equation above Output kVA is the nameplate kVA capacityNoise Consideration Radiator discharge air high frequency soundNoise Laws and Regulations Noise Zones Peak DayComparison Chart dBA Environmental Considerations dBAAdding Additional Sound Sources Below estimates the noise level from multiple noise sourcesEffects of Distance Distance Effects on dBAReducing Noise Following will help reduce structure-borne noiseSee on page 32 for typical measures in reducing noise Following will help reduce airborne noiseAcoustic Material Reducing NoiseAccess to Set MountingMounting on a Slab Floor Mounting on a Sub-Base Fuel TankMounting Foundation Mounting FoundationGeneral Information Mountingthe Generator SETVibration Isolators Installation and Adjustment Procedure Mounting Vibration IsolatorsMechanical Installation Fuel System Diesel Fuel System InstallationDiesel Fuel Supply TankMechanical Installation Fuel System Diesel Diesel Fuel Supply Minimum Fuel Supply / Return Hose and Pipe SizesMechanical Installation Fuel System Gaseous Fuels Contaminants Mechanical Installation Fuel System Gaseous FuelsGaseous Fuel Supply Pipe and Tube Sizing Natural GAS Schedule 40 Iron Pipe SizingTypical Pipe Schematic for Propane Vapor Distribution Mechanical Installation Fuel System Liquid Propane Schedule 40 Iron Pipe SizingEnvironmental Protection Fuel Storage RegulationsAdditional references include Exhaust System Installation Mechanical Installation Exhaust SystemField Installing a Generator Exhaust System Mechanical Installation Exhaust System Condensation Trap Exhaust System Installation Reference Data Factory Recommended Engine Exhaust SilencersMechanical Installation Battery System Purpose of the BatteryMQ Power Batteries How BatteriesWork„ See the Battery Safety Instructions on Mechanical Installation Battery SystemEngine Starting System Mechanical Installation NEW Battery New Battery InstallationPreparation of Charged and Wet Batteries Preparation of Dry Charged Charged and Moist BatteriesMechanical Installation NEW Battery Removing Old BatteryDry Charged Batteries Charged and Moist Batteries ActivationBattery System -TESTING Battery BatteryTestingStep One 1 -Visual Inspection See Flow Chart, on next Step Three 3 Load ProcedureBattery System Batterytesting Chart Battery Testing ChartBattery Storage Battery System Charging BatteryCharging LowWater-loss Batteries Battery System Battery Charger Battery System Battery Charger FC & FCA Battery ChargerLC1224-500-2 Battery Charger FC1224-10-2011U Battery ChargerBattery Charger Installation Battery System Battery Charger SafetyBattery Charger Safety Mechanical Installation -VENTILATION and Cooling Engine CoolingVentilation and Cooling Vents and DuctsMechanical Installation -VENTILATION and Cooling LouversMechanical Installation Mounted Radiator Cooling Factory Mounted RadiatorVentilationMounted Radiator Cooling System Mechanical Installation Mounted Radiator CoolingRadiator Set Requirements Mechanical Installation Remote Radiator Cooling Remote Radiator Cooling optionalMechanical Installation Remote Radiator Cooling Remote Radiator CoolingMechanical Installation Hotwell Cooling Hot Well InstallationHeat Exchanger Mechanical Installation Heat Exchanger Cooling19,200/60x8 = 40 gpm CoolantTreatment Coolant TreatmentCoolant Heaters Electrical Installation DC Controlwiring DC Control Wiring Control BOX Back Panel Control BoxControl box contains the following „ Digital Control Module „ Control Box Back Panel ComponentsDC Controlwiring Control BOX Back Panel L3 3 PHGenerator Set Wire Diagram Transfer Switch AC Electrical ConnectionsAC Electrical Connections Connection Of Generator Leads For Correct Voltage OutputElectrical Terminations Mounted fuel tank is used, the electrical stub-upBreaker Line circuit breakerAC Electrical Connections System Grounding AC Electrical Connections System Grounding Pole ATSAC Electrical Connections Equipment Grounding Equipment GroundingElectrical Distribution System Electrical Distribution SystemPRE-START Preparation PRE-START Preparation Run the Generator SetAppendix Installation Checklist For MQ Power Industrial Generators Appendix MAIN-LINE Circuit BreakerAppendix MAIN-LINE Circuit Breaker Appendix Generator Specifications MQ Power Industrial Generator SpecificationsAppendix Generator Specifications MQ Power Industrial Generator Specifications Appendix Engine Specifications Appendix Engine Specifications MQP175IV MQP200IV MQP250IVGenerator Model MQP300IV MQP350IV MQP400IV Appendix Engine Specifications Generator Model MQP30GM MQP45GM MQP60GM MQP80GM MQP100GMAppendix Dimensions and Weights MQ Power Generator Dimensions & WeightsAppendix Dimensions Andweights MQ Power Generator Dimensions & WeightsHeres HOW to GET Help