![](/images/new-backgrounds/1134443/134443309x1.webp)
Chapter 11. Testing
Stop Test
Ends the test in progress prematurely or terminates a continuous test.
View Test
Displays the TEST STATISTICS menu shown in Figure
PVC Active/Inactive/Undefined
Displays current state of the selected PVC as determined by the switch.
•Active: The PVC is currently operational.
•Inactive: There is currently a physical or frame relay layer problem at the remote end of the PVC, or a problem exists inside the frame relay cloud for the selected PVC.
•Undefined: The PVC is undefined for the switch.
Test Active/No Test Active
Displays current testing state of the TSU IQ+.
Frames Rx
Number of frames received on the selected PVC during the current loopback test.
Frames Tx
Number of frames transmitted across the selected PVC during the current loopback test.
Lost Frames
Number of frames lost in the receiving direction (traveling from the remote TSU IQ+ to the local TSU IQ+).
Remote Lost Frames (RMT LOST FRAMES)
Number of frames lost in the transmitting direction (traveling from the local TSU IQ+ to the remote TSU IQ+).
Minimum Loop Response Time (MIN RESP TIME)
Minimum
Maximum Loop Response Time (MAX RESP TIME)
Maximum
TSU IQ+ User Manual |