SwitchBlade x8112 Chassis Switch Installation Guide

Figure 146. Lifting the Locking Handle and Removing the Power Supply

12.Do one of the following:

To install a new power supply, refer to Chapter 4, “Installing the Power Supplies” on page 87.

If you are not installing a new power supply, continue with this procedure to install a blank slot cover.

13.Place the locking handle on the slot cover in the up position and slide the cover into the empty power supply slot. Refer to Figure 147 on page 218.

217

Page 217
Image 217
Allied Telesis X8112 manual 217