Chapter 2: Safety Precautions and Site Requirements

Installation Tools and Material

This section lists the tools and material you need to supply to install the product:

Here are the items for installing the chassis in an equipment rack:

#2 Phillips-head screwdriver

Six equipment rack screws

Flat-head screwdriver

#2 Phillips-head 10 inch-lbs torque screwdriver (optional)

Here are the items for installing the grounding wire:

#2 Phillips-head screwdriver

Crimping tool

10 AWG stranded grounding wire

#2 Phillips-head 20 inch-lbs torque screwdriver (optional)

Here are the items for installing the AT-SBxPWRSYS1 DC Power Supply:

Two 8 AWG power wires

One 10 AWG stranded grounding wire

8 mm wrench

#1 Phillips-head screwdriver

#3 Phillips-head screwdriver

#3 Phillips-head 30 to 40 inch-lbs torque screwdriver (optional)

Here are the items for installing the AT-SBx81CFC400 Controller Fabric

Card and Ethernet line cards:

#2 Phillips-head screwdriver

#2 Phillips-head, 5 inch-lbs torque screwdriver (optional)

70

Page 70
Image 70
Allied Telesis X8112 manual Installation Tools and Material