SwitchBlade x8112 Chassis Switch Installation Guide

Preparing the Equipment Rack

This section explains how to prepare the equipment rack for the chassis.

The procedure requires the following items:

#2 Phillips-head screwdriver (not provided)

Two equipment rack screws (not provided)

To prepare the equipment rack for the AT-SBx8112 Chassis, perform the following procedure:

Caution

The chassis is heavy and should be mounted as low as possible in the equipment rack to maximize vertical stability.

1.Reserve 311.1 mm (12.25“) of vertical rack space for the installation of the AT-SBx8112 Chassis, as shown in Figure 29 on page 74.

2.Do not mount any other equipment within 152.4 mm (6”) above this space during installation. This additional vertical space is temporary and allows you enough room to lift and tilt the chassis into its position in the equipment rack without hitting other equipment, as shown in Figure 35 on page 81. You may use this additional space for other network equipment after the chassis is installed.