3.Identify the lowest 1/2” screw hole pattern on the rack mounting rails within the space reserved for the AT-SBx8112 Chassis.

4.Install one rack mount screw in each vertical rail, at the same height in the top screw hole of the lowest 1/2” hole pattern, as shown in Figure 30. The screws are used to support the chassis while you secure it to the rack. Do not fully tighten these two screws at this time. The screw heads should protrude from the rack approximately 6.4 mm (.25 in).

Screw head

6.4mm (.25 in) away from rack

Top screw hole of the lowest 1/2” hole pattern

Figure 30. Rack Mounting Hole Locations

5.After installing the two screws in the equipment rack, go to “Unpacking the AT-SBx8112 Chassis” on page 76.