Mechanical installation
Setting of the "Gripsol" bolsters
Preparation of the ground and machine :
-Degrease carefully the ground and the soles of the machine. Preparation of the "Gripsol" bolsters :
-Soak the bolsters in hot water during 5 minutes, then let them in open air for 3 to 4 minutes.
-Then unstick the protective fi lm on the two adhesive sides.
Setting the "Gripsol" bolsters :
-Place each bolster (G) at its respective location (see drawing). Check that the bolster projects inside the soles and heave successively each bearing of the machine.
Putting the machine into service
-Waiting time : Before putting the machine into service, it is necessary that each bearing is well fi xed by crushing of the upper layer of "Gripsol" and that the lower layer has penetrated in the porosity of the ground.
For an ambient temperature of 18 °C (65 °F), the crushing time is two hours.
Electrical safety device :
-As "Gripsol" is a very good electric insulating material, the earthing of the machine is compulsory.
To displace the machines sealed with "Gripsol" bolsters, you just have to heave the machine and pull off the "Gripsol" bolsters.