Check-out
Before leaving, put the appliance into operation and allow to run a com-
plete cycle. Watch to ensure that all burner system components function
correctly.
IMPORTANT
Tightness test after installation
The gas leak test is performed as follows :
Paint pipe joints, pilot gas tubing connections and inspect outlets with
rich soap and water solution ; do not use an aggressive soap.
Put the machine into service. Bubbles indicate a gas leak.
Eliminate this leak.
1.
2.
3.
NOTE : After all intervention, re-seal (red varnish) the following adjustment
organs :
- regulator of pressure
In case of changing of gas, the stick for the adjustment has to be modiļ¬ ed.