Fault Repair and Commissioning

Hydrastep Pressure Parts

f)Refit the electrical lead(s) and guard. Recommission as detailed later in this Chapter.

3.1.5PROCEDURE FOR CHANGING HIGH PRESSURE ELECTRODES

Carry out the isolation procedure as detailed in sub-section 3.1.2. Ensure that the tripping is disabled (see ‘Safety Precautions’, sub-section 3.1.1). There is no need to switch off the Hydrastep electronic equipment; allow system about 20 minutes to cool down, then:

a)Remove the electrode cover guard, taking care to avoid knocking the electrodes. Note: Remove only one electrode at a time (avoids risk of incorrect reconnection)

b)Disconnect the leads, extract the electrode carefully without damage to the seat face.

c)Inspect the column seat, remove any scaling or residue taking care not to damage the seat.

d)Carefully unpack the new electrode and check that there is no damage to the ceramic insulators or to the seating ferrules.

e)Lightly coat the electrode threads with anti-seize compound (Part No.: 830007220) and assemble the new electrode to the water column as detailed in sub-section 3.1.3 for high pressure electrodes.

Note: At the first pressure/temperature test, check for leaks and tighten electrode nut as necessary, but not exceeding ¼ turn from the ‘nipped electrode’ condition.

f)Refit the electrical lead(s) and guard. Recommission as stated in section 3.2.

3.2WATER COLUMN COMMISSIONING OR RECOMMISSIONING

The method given allows the column to fill slowly with condensate from the steam leg through a ‘cracked’ steam valve and for subsequent warming to continue at a controlled rate as the water is forced back through the ‘cracked’ water valve.

Caution: DO NOT BLOW WATER COLUMN DOWN

a)Notify the unit operator of the intention to commission the column, in accordance with recognised procedures.

b)Check that the electrode guard is in place.

c)Close the drain valves.

d)Crack open the steam valve. Check with the display or the unit operator that the column fills with condensate slowly (10 to 15 minutes).

e)Crack open the water isolating valve. Check with the unit operator that the water level is falling (1 to 2 minutes) to approximately normal water level and allow to stabilise and heat up for 15 minutes.

f)Open the water valve fully.

g)Open the steam valve fully.

3.2.1VENT AND DRAIN VALVE REPAIRS

These will usually involve replacement of the gland packing or regrinding of the seat, and should follow the normal practice for the particular valve types concerned. If it is necessary to replace an entire valve, ensure that the new valve is correctly orientated for its sealing direction.

3-6

24675030

Page 166
Image 166
Emerson 2468CB, 2468CD manual 3.2WATER COLUMN COMMISSIONING OR RECOMMISSIONING, 3.2.1VENT AND DRAIN VALVE REPAIRS