Fault Repair and Commissioning

Hydrastep Pressure Parts

Fault Repair and Commissioning

3

Fault Repair and Commissioning

Contents

 

 

 

 

Page No.

3.1

BACKGROUND

3-3

 

3.1.1

SAFETY PRECAUTIONS

3-3

 

3.1.2

WATER COLUMN ISOLATION

3-4

 

3.1.3 ELECTRODE AND ELECTRODE SEAL LEAKS

3-4

 

 

3.1.3.1

LOW PRESSURE ELECTRODES

3-4

 

 

3.1.3.2

HIGH PRESSURE ELECTRODES

3-5

3.1.3.3TIGHTENING PROCEDURE FOR HIGH PRESSURE ELECTRODE

 

INSTALLATION

3-5

 

3.1.4 PROCEDURE FOR CHANGING THE LOW PRESSURE ELECTRODES

 

AND GASKETS

3-5

 

3.1.5 PROCEDURE FOR CHANGING HIGH PRESSURE ELECTRODES

3-6

3.2

WATER COLUMN COMMISSIONING OR RECOMMISSIONING

3-6

 

3.2.1 VENT AND DRAIN VALVE REPAIRS

3-6

 

3.2.2 WATER COLUMN TRANSIENT RESPONSE

3-7

 

3.2.3 WATER COLUMN OR PIPEWORK BLOCKAGE

3-7

 

3.2.4 WATER COLUMN LIFE

3-7

Note:

THERE IS NO NEED TO BLOW WATER COLUMN DOWN WHEN COMMISSIONING. THE SYSTEM CONTINUOUSLY FLUSHES THE WATER COLUMN.