|
| Contents |
|
Chapter 1 | System Description | 1 | |
1.1 | Abbreviation | 1 | |
1.2 | Introduction | 1 | |
1.3 | Features | 1 | |
1.4 | System Configuration | 2 | |
1.5 | Components | 4 | |
1.5.1 | Rectifier Shelf | 4 | |
1.5.2 | Rectifier | 6 | |
1.5.3 | SCU | 7 | |
1.5.4 | 9 | ||
1.5.5 Battery Connection Unit (BCU) | 10 | ||
1.5.6 | System Cabinet | 11 | |
Chapter 2 | Installation | 12 | |
2.1 | Installation Preparation | 12 | |
2.1.1 | Environmental Conditions | 12 | |
2.1.2 | Power Supply | 12 | |
2.1.3 | Site Survey | 13 | |
2.1.4 | Tools & Material | 13 | |
2.1.5 | Unpacking | 14 | |
2.2 | Installation Procedures | 15 | |
2.2.1 | Cabinet Installation | 15 | |
2.3 | External Electrical Connection Interface | 17 | |
2.3.1 Connection Of Input Cables | 17 | ||
2.3.2 Connection Of Load Cables | 20 | ||
2.3.3 Connection Of Communication Cables | 21 | ||
2.3.4 Layout Of Connector Board S6415X2 | 22 | ||
2.3.5 Interface Definition Of Connector Board S6415X2 | 23 | ||
2.3.6 Connection Of Temperature Sensor Cables | 24 | ||
2.3.7 | Connection With MODEM | 24 | |
2.3.8 Connection With Dry Contacts | 25 | ||
2.4 | Battery Installation And Cabling | 25 | |
2.4.1 | Battery Installation | 25 | |
2.4.2 | Battery Cable Connection | 26 | |
2.5 | Parallel Connection Of Cabinets | 29 | |
Chapter 3 | Startup | 30 | |
3.1 | Checking Before Startup | 30 | |
3.2 | Startup Process | 31 | |
3.3 | Parameters Configuration | 31 |