Instruction Manual

IM-106-340, Rev. 4.0 May 2006

Oxymitter 4000

Section 3 Configuration of Oxymitter 4000 with Membrane Keypad

Verify Installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . page 3-1

Logic I/O . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . page 3-5

VERIFY INSTALLATION

Mechanical Installation Terminal Block Wiring

Install all protective equipment covers and safety ground leads before equipment startup. Failure to install covers and ground leads could result in serious injury or death.

Ensure the Oxymitter 4000 is installed correctly. See Section 2: Installation.

1.Remove cover (27) to expose terminal block (25).

2.Check the terminal block wiring (Figure 3-1). Be sure the power,

4-20 mA signal, and the logic outputs are properly connected and secure. To avoid a shock hazard, the power terminal cover must be installed. For units with remote electronics, check the terminal block wiring at the probe and at the remote electronics unit.

3.Install housing cover (27, Figure 9-3or Figure 9-4)on terminal block (25).

http://www.processanalytic.com

Page 57
Image 57
Emerson Process Management IM-106-340 Configuration of Oxymitter 4000 with Membrane Keypad, Verify Installation