EPSON Stylus Scan 2500

Revision A

Step 6. Remove two CBP 3x8 screws.

Step 3. Loosen the screws on the right and left sides of the paper eject frame assembly.

Step 5. Release the hooks

from the right frame

assembly.

Pump Assembly

Cap Assembly

Step 7. Release the hook

from the back of the printer mechanism and pull out two protrusions from the subframe.

Figure 4-2. Removing the Cap and Pump Assemblies

Disassembly & Assembly

Removal of the Printer Consumables

95

Page 96
Image 96
Epson Scan 2500 service manual Removing the Cap and Pump Assemblies