EPSON Stylus Scan 2500

Revision A

4.6.3 Removing the CR Motor Assembly

(No.1)

1.Remove the housing. (Refer to Section 4.3)

2.Rotate the gear 73.6 toward you and release the carriage lock mechanism, then move the carriage to the center.

3.Pull out the circuit board tray as described in “Removal of the Circuit Board Tray” on pag e90, and disconnect the CR motor cable from CN7.

4.Loosen the timing belt by pushing the driven pulley holder and remove the timing belt from the pulley on the CR motor.

5.Remove two screws (CBS 3x6) and remove the CR motor assembly.

CH E CAfterK installing the CR motor assembly, make sure that P O I NtwoT protrusions on the motor bracket are aligned with

the location holes in the frame. (Refer to Figure 4-7.)

Compression Spring 19.6

Driven Pulley Assembly

 

Timing Bell

Make sure that protrusions of CR frame are in the holes of

frame when installing the CR motor assembly.

Figure 4-7. Removing and Installing the CR Motor Assembly

To the Exterior

of Side Frame

Driven Pulley

Holder

To the Interior of

Side Frame

Figure 4-6. Removing the Timing Belt

Disassembly & Assembly

Disassembling the Printer Mechanism

99

Page 100
Image 100
Epson Scan 2500 service manual Removing the CR Motor Assembly, No.1