4 - 64HOW TO USE THE INSTRUMENT

DELAYED TIMEBASE

DELAY

Use the DELAY control to select the start of intensified part of the signal in the upper trace. The intensified part acts like a window over the Main Timebase trace.

 

 

MTB 1.00ms

CH1

CH1

500mV

DTB 100μs

2.675ms

DELAY

 

 

MTB 1.00ms

CH1

CH1

500mV

DTB 100μs

6.225ms

 

 

 

ST6726

DELAYED TIMEBASE

TIMEBASE

-Press either key of the Del’dTB TIME/DIV keys.

When you press the left key, the intensified part of this signal gets longer. More periods of the signal are displayed on the Delayed Timebase. When you press the right key, the intensified part of this signal gets shorter and fewer periods of the signal are displayed on the Del’dTB. This way you can select any small portion of a signal and capture and display it with a higher resolution.

sTIME/DIV ns

MTB 1.00ms DTB 500us

MTB 1.00ms

DTB 50.0μs

ST6727

9303

Page 109
Image 109
Fluke PM3370B user manual 64HOW to USE the Instrument, Press either key of the Del’dTB TIME/DIV keys