Figure 40: Rails Fully Extended

CAUTION!

Lifting and placing the chassis in the rails is a two-person job. If needed, use an appropriate lifting device. A fully loaded Viglen SX220 server weighs approximately 23.1 kg (51 lbs.).

2.With the chassis front facing you, lift the chassis and carefully insert the rails attached to the chassis in the extended rails.

3.Slide the chassis toward the rear of the cabinet until the rails lock together.

4.Depress and hold down the finger tabs (Figure 41, A) on both extension locks while sliding the chassis towards the rear.

Figure 41: Sliding the Chassis towards the rear of the Rack

56

Viglen SX220 User Guide

Page 57
Image 57
Intel SX220 manual Rails Fully Extended