Chapter 5

Installing and Connecting a Services Router

Make the appropriate preparations and verify the J-series equipment before installing a J-series Services Router and connecting it to a power source and the network.

CAUTION: Do not install a combination of modules in a single chassis that exceeds the maximum power and heat capacity of the chassis. If J-series power management is enabled, PIMs and modules (PIMs or PIMs plus a WXC Integrated Services Module) that exceed the maximum power and heat capacity remain offline when the chassis is powered on.

This chapter contains the following topics:

Before You Begin on page 77

Unpacking a J-series Services Router on page 78

Installing J2320 and J2350 Routers on page 79

Installing J4350 and J6350 Routers on page 80

Connecting Interface Cables to Services Routers on page 83

Chassis Grounding on page 83

Connecting Power on page 84

Powering a Services Router On and Off on page 89

Before You Begin

Before you begin installation, complete the following tasks:

Read the information in “Maintenance and Operational Safety Guidelines and Warnings” on page 225, with particular attention to “Chassis Lifting Guidelines” on page 216.

Determine where to install the Services Router, and verify that the rack or installation site meets the requirements described in “Preparing for Router Installation” on page 63.

For installation, gather the following equipment and tools:

Before You Begin 77

Page 101
Image 101
Juniper Networks J2350 manual Installing and Connecting a Services Router, Before You Begin