EMI (electromagnetic interference)
compliance with requirements............................233
standards............................................................232
suppressing...........................................................68
encrypted access
through SSH..........................................................95
environmental requirements for operation..................66
ePIMs
4-Port Fast Ethernet..............................................54
Copper Gigabit Ethernet........................................44
SFP Gigabit Ethernet.............................................44
slot locations.........................................................27
EPROM..................................................................12, 25
ESD (electrostatic discharge), preventing...................201
ESD wrist strap
verifying resistance, for safety............................201
wearing during installation....................................21
Ethernet cable
chassis console DB-9 connector pinouts..............191
chassis console, RJ-45 connector pinouts............190
connecting the Services Router to a management
device.........................................................97, 99
connecting the Services Router to a modem.......102
replacing.............................................................120
Ethernet ports See Fast Ethernet ports See Gigabit
Ethernet ports
Ethernet rollover cable, connecting the router to a
management device...............................................162
European Union, compliance statement....................235
external compact flash See compact flash
F
failures
compact flash, USB for....................................17, 30
PIM, troubleshooting...........................................158
Routing Engine fan, troubleshooting...................158
fans
description......................................................19, 32
See also air filter
See also cooling system
failure, troubleshooting.......................................158
Fast Ethernet ports
4-Port Fast Ethernet ePIM.....................................54
ACTIVITY status (dual-port PIM)............................53
Dual-Port Fast Ethernet PIM..................................53
LED states (4-port ePIM).......................................55
LED states (dual-port PIM).....................................53
link activity (4-port ePIM)......................................55
link status (4-port ePIM)........................................55
LINK/ SPEED status (dual-port PIM).......................53
RJ-45 connector pinout.......................................189
FCC Part 15 compliance statement............................237
FCC Part 68 compliance statement............................237
field-replaceable units, replacing................................119
filter cover See air filter
filter, air See air filter
fire extinguishers
prohibited.............................................................67
required................................................................67
fire safety requirements...............................................66
fire suppression
equipment required..............................................67
shutdown requirement.........................................66
font conventions........................................................xviii
FPC, PIM slot number in command
displays..........................................................124, 169
front panel.............................................................13, 26
FRUs (field-replaceable units), replacing.....................119
G
G.SHDSL PIM
description............................................................58
PIM ONLINE LED..................................................59
G.SHDSL ports See SHDSL ports
gateway, default...........................................................93
ge-0/0/0
connecting through J-Web.....................................97
defining address (configuration editor)...............113
defining address (Quick Configuration)...............105
for autoinstallation................................................94
management interface..........................................94
Gigabit Ethernet ePIMs
alarms...................................................................46
description............................................................44
high-speed slot locations.......................................46
installation............................................................46
LEDs.....................................................................46
limitations.............................................................46
link speeds and transmission modes ...................45
SFP, optical interface support...............................46
Gigabit Ethernet ports
built-in............................................................17, 29
copper..................................................................44
LED states...........................................17, 29, 44, 46
port 0....................................................................94
RJ-45 connector pinouts (ePIM)...........................190
RJ-45 connector pinouts (uPIMs).........................189
SFP (optical)....................................................43, 45
Gigabit Ethernet uPIMs
alarms...................................................................44
description............................................................41
installation............................................................43
LEDs.....................................................................44
limitations.............................................................43
link speeds and transmission modes ...................43
SFP, optical interface support...............................44
glossary
basic connectivity.................................................91
PIMs.....................................................................35
graceful shutdown........................................................89
Index 245
Index