1

RAID controller

2

Retention bracket

3

SAS riser card

5.Remove the retention bracket from the current location:

a.Pinch the bottoms of both bracket posts and push the posts up out of the SAS riser-card assembly.

b.Rotate the bracket 2 to free the bracket tab from the slot on the SAS riser-card assembly 1.

6.Install the retention bracket in the new location on the SAS riser-card assembly:

a.Insert the bracket tab 2 into the slot on the SAS riser-card assembly1.

b.Rotate the bracket so that the bracket posts align with the holes in the SAS riser-card assembly.

c.Press the posts through the holes in the SAS riser-card assembly until they click into place.

Chapter 5. Installing optional devices and replacing customer replaceable units 83

Page 99
Image 99
Lenovo 3797 manual RAID controller