
Chapter 4: Installing the Hardware
___________________________________________________________________
Chapter 4: Installing the Hardware
Cable Kit Notes
The cable kit
The cable kit
Verify the Marathon base unit, and jumper position (if necessary) before installing the Magnum Router.
Installing the Magnum Router Module into the Marathon base unit
Follow these steps to install the hardware.
1.Remove the power cord from the Marathon base unit. Remove the top cover. Remove all of the necessary “blank” back plane dividers and internal module spacers (found at the front of each module, nearest the LED’s).
2.Determine which level within the back plane the Magnum Router module is to be installed. It is recommended that the Magnum Router be installed in the last module slot or
The Marathon CCM does not recognize the Magnum Router. This means that if the Magnum is placed in the “B” slot, and the card above it is set for “B”, there will not be a conflict. However, to eliminate confusion it is recommended that the Magnum Router be placed in the top most level of the Marathon unit.
3.Install the module in the Marathon chassis like any other Marathon expansion module paying close attention to the placement of the 2 “50 pin bus connectors” on the right side of the module. Apply a reasonable amount of pressure over the bus connectors to ensure the module is properly “seated” then
4.