Motorola CPCI-6020 manual Unpacking and Inspecting the RTM, Preparing the Transition Module

Models: CPCI-6020

1 168
Download 168 pages 56.7 Kb
Page 131
Image 131

Unpacking and Inspecting the RTM

Transition Module Preparation and Installation

 

 

7.3Unpacking and Inspecting the RTM

Read all notices and cautions prior to unpacking the product.

Damage of Circuits

Electrostatic discharge and incorrect installation and removal can damage circuits or shorten their life.

Before touching the AMC or electronic components, make sure that you are working in an ESD-safe environment.

Shipment Inspection

To inspect the shipment, perform the following steps:

1.Verify that you have received all items of your shipment.

2.Check for damage and report any damage or differences to customer service.

3.Remove the desiccant bag shipped together with the board and dispose of it according to your country’s legislation.

The product is thoroughly inspected before shipment. If any damage occurred during transportation or any items are missing, contact customer service immediately.

7.4Preparing the Transition Module

Before installing the CPCI-6020-MCPTM-01, read these sections for important information on module configuration and operations.

7.4.1Serial Ports 1 and 2

The CPCI-6020 provides two 16550 compatible asynchronous serial interfaces: COM1 and COM2. The COM1 port signals are wired to the front panel RJ-45 connector, but it may optionally be wired to the backplane via J5 instead. The COM2 port is wired to the J5 connector only.

COM1 is routed to an RJ-45 connector located at the rear panel of the CPCI-6020-MCPTM-01. COM2 can be accessed by a planar 9-pin header on the transition module. The COM2 signals are also wired to the PMC I/O connector for possible access through PMC I/O module.

CPCI-6020 CompactPCI Single Board Computer Installation and Use (6806800A51C)

131

Page 131
Image 131
Motorola CPCI-6020 manual Unpacking and Inspecting the RTM, Preparing the Transition Module, Serial Ports 1