(

M R V C o m m u n i c a t i o n s , I n c . – I n s t a l l a t i o n M a n u a l

Repeat this process for the vertical positioning (middle of segment [V1,V2]).

V1

H1 H2

V2

Figure 6.14: Final position after the vertical aiming

Once the position is reached, tighten firmly the 4 Fine Locking Screws (2xF2, 2xF1 and G1).

Repeat this procedure interchanging roles with the second installer at the opposite site, i.e., the second installer will move the remote transceiver while the first installer will report the digital readout at his end).

After finishing the alignment process it’s possible to remove the alignment kit (2 Aiming Lugs E1, E2 and Bolts K and D and screws B and C).

At the end of the procedure, the digital readout should be approximately the same on both transceivers (see Appendix B page 44 for expected readings).

D

F1

E2 (and 2 screws ‘C’and 2 bolts ‘D’) can be removed after finishing the alignment process.

F2

CK

Fig. 6.15a and 6.15b: Alignment screws

G1

B (x2)

E1 (and 2 screws ‘B’ and 2 bolts ‘K’) can be removed after finishing the alignment process.

43

Page 53
Image 53
MRV Communications TS800/155, TS700/155, TS700/100, TS700/G user manual 15a and 6.15b Alignment screws