Downgrade a full system 117

Downgrade a full system navigation

"Preparing for full system downgrades" (page 117)

"Downgrading a redundant system" (page 118)

"Downgrading a non-redundant system" (page 118)

Preparing for full system downgrades

Before performing full system downgrades, follow the instructions in this procedure.

Procedure Steps

Step Action

1(Optional) Compose a list of all Network Elements and the servers they reside on, including the redundant Network Elements. Use this list to keep track of which Network Elements have been downgraded.

Application Server 5300

Nortel AS 5300 Installation

NN42040-300 01.04

4 November 2008

Copyright © 2007-2008 Nortel Networks

Page 117
Image 117
Nortel Networks 53r 5300 00 manual Downgrade a full system navigation, Preparing for full system downgrades