
MCP core software load patch installation 81
Prerequisites
•Network Elements are configured on the system.
•You understand the service issues associated with patching Network Elements.
•You must be assigned to the AA role (ntappadm).
Procedure Steps
Step Action
1From the System Management console menu, select Tools > Patch/MR Manager.
The Patch/MR Manager window appears.
2From the Load or Patch list menu, choose the load patch being applied.
The Load Manager window appears.
3In the Load Manager window navigation tree, expand a Network Element folder.
4From the expanded Network Element folder, select the element to be patched in the following order:
•Fault Performance Managers
•Accounting Managers
•Provisioning Managers
•Personal Agent Managers
•Session Managers
•IP Client Managers
5On the maintenance panel, click Patch.
The NE Maintenance Panel window appears. From this window you can monitor the patch installation.
Application Server 5300
Nortel AS 5300 Installation
4 November 2008