Nortel Networks P0992639 01 manual Installation

Models: P0992639 01

1 144
Download 144 pages 60.53 Kb
Page 39
Image 39

Installation / 33

5.Mount the base station onto the bracket, snapping it into position.

6.Connect the power RJ11 jumper lead to the RJ11 jacks on the termination board and the base station.

7.For plug-top power supplies only, connect the power supply connector to the base station power connector. Make sure the base station is powered by a class 2 plug-top power source only.

Inserting the power supply connector in the wrong direction may damage the plug-top power supply and the base stations.

Position the power supply connector in the proper direction and push it into place securely.

8.Record the associated ICS port number in the space provided on the printed label affixed on the lower right corner of the mounting bracket.

Include the labeling information for each Companion base station on the completed installation floor plans.

9.Slide the cover onto the bracket, using the guide to position it properly. Snap it into place.

P0992639 01

Modular ICS Companion Installer Guide

Page 39
Image 39
Nortel Networks P0992639 01 manual Installation