AFront Panel
There are two shapes for the front panel.
BPower Indicator LED
This LED light is on when the power is turned on.
CCartridge Dock
Load and exchange cartridges in the cartridge dock. When the cartridge dock is specified using the control buttons, its shutter opens automatically. The library does not operate while the cartridge dock shutter is open, so close the shutter using the control buttons after loading or exchanging cartridges.
DLiquid Crystal Display
The LCD panel displays information such as the operating status. When in normal standby state, it displays the status of the AIT library.
EControl Buttons
These buttons are used to control operations through the Control Panel Menu.
FError LED
This LED light is on when an error occurs.
GVentilation Holes
Please be careful not to block the ventilation holes. If the ventilation holes are blocked, the AIT library may overheat, resulting in fire or other damage.
Rear
1 2 | 3 | 4 | 5 | 67 |
| ||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
APower Supply Connector
Plug the provided power cord into this connector.
BPower Switch
Press this switch to turn the library on and off.
CFan Unit
Please be careful not to block the ventilation holes. If the ventilation holes are blocked, the AIT library may overheat, resulting in fire or other damage.
DTransport Screw
During installation, remove the transport screw and set it in the bottom hole (Operation position). Before transport, make sure that you read “Transporting the AIT Library” (page 93) in the “Appendix” chapter, and make sure that the transport screw is in the upper hole (Shipping position).
Chapter 1 Introduction | 9 |
|
|