Baldor GLC50, GLC35, GLC80, GLC125 manual Approximate Load Bearing Capacities of Various Soil Types

Page 18

Table 2-1 Approximate Load Bearing Capacities of Various Soil Types

Soil Type

 

 

Safe Bearing Capacity

 

lb per ft2

kilo Pascals

 

Hard Rock – Granite etc.

50,000

– 200,000

2,395

– 9,576

Medium Rock – Shale etc.

20,000

– 30,000

958 – 1,436

Hardpan

16,000

– 20,000

766

– 958

Soft Rock

10,000

– 20,000

479

– 958

Compacted Sand and Gravel

10,000

– 12,000

479

– 575

Hard Clay

8,000

– 10,000

383

– 479

Gravel and Coarse Sand

8,000

– 10,000

383

– 479

Loose, Medium and Coarse Sand

8,000

– 10,000

383

– 479

Compacted Fine Sand

6,000

– 8,000

287

– 383

Medium Clay

4,000

– 8,000

192

– 383

Loose Fine Sand

2,000

– 4,000

96 – 192

Soft Clay

2,000

 

96

Table 2-1 shows approximate load bearing capacities for various types of soil if the actual load bearing capacity of the soil under the foundation is not known.

Caution: Check the local building codes for load bearing capacity requirements.

Caution: If the soil is subject to freezing and thawing, the foundation must be extended below the frost line. Check the local building codes.

SReinforce the foundation with No. 8 gauge steel wire mesh placed horizontally on 6in (150mm) centers. As an alternative, use No. 6 re–bars on 12in (300mm) centers horizontally. Minimum cover over the bars should be 3in (76mm).

SSuggested concrete mixture by volume is 1 part cement, 2 parts sand, and 3 parts aggregate. Maximum slump of 4in (100mm) and a 28–day compressive strength of 3000 psi (20,600 kPa).

SThe size of the bolts holding the sub–base to the foundation should be sized to fit the mounting holes shown on the Installation Diagram.

SThree–inch (76mm) iron pipe sleeves should be placed around the bolts in the foundation to allow for any mislocation of the bolts after the foundation hardens. “J” or “L” type bolts are recommended for the foundation bolts.

SAfter the foundation is cured and the genset is located, the sleeves are filled with grout. Figure 2-5 shows a typical foundation installation.

Figure 2-5 Typical Foundation Installation

2-8 General Information

MN2408

Image 18
Contents GLC Generator California Proposition 65 Warning Table of Contents Generator AC Metering Engine Parameter Display Appendix aSection Product Safety Information Read This Manual ThoroughlySymbols OperationOperation Warning Statements Burn Installation Maintenance Product Safety Information MN2408 Limited Warranty Warranty PeriodLabor Parts General Information MN2408 Installation Guidelines Site PlanningExhaust System Controls and Transfer SwitchEngine Cooling System Room AirFoundation Design Foundation Checklist Setting The Genset On An Existing Concrete Floor SlabVibration Isolators Weight Of The Genset Approximate Weight vs. kW OutputDesigning An Isolated Foundation Calculate Soil Bearing Load SBL CapacityTypical Foundation Installation Approximate Load Bearing Capacities of Various Soil TypesMulti-Engine Installations Exhaust System Exhaust ChecklistSystem Placement Level Of AttenuationExhaust System Calculations Exhaust Piping Cooling System Cooling System Checklist Radiator CoolingHeat Exchanger Cooling System DeterminationCooling System Design Engine Mounted Radiator Cooling Hot Well Installations Remote Radiator Cooling11 Valves & Fittings and Fluid Flow in Pipe Other Considerations 13 Coolant Mixture Air System Air System Checklist Wind BarrierEngine Crankcase Ventilation Transfer Switch Transfer Switch Checklist Transfer Switch LocationBattery Starting System Battery LocationBattery Charger Battery CablesGeneral Information MN2408 When the Generator is installed outdoors Generator LiftingMounting Dimensions Generator MountingSecure the Generator Ventilation TestHot Exhaust Gasses Backpressure must not exceed 20 of water columnGuidelines for Exhaust System Page Fuel Connections Fuel Consumption Natural and LPGGeneral Considerations Example Determining Pipe Size for Natural Gas Natural Gas ConnectionsNatural Gas Flow Rate Cubic Feet per Hour per Pipe Length Example Determining Pipe Size for LPG LP Gas Flow Rate Cubic Feet per Hour per Pipe LengthTransfer Switch Considerations RatingThree Phase WYE and Delta Connections Battery Charger Considerations General Wiring ConsiderationsFrame Ground Connection Page GLC100 Recommended Engine Oil and Battery TypePost Installation Checks GLC125Post Installation Checks Operator Control Panel Digital Engine Controller Only Run SwitchOn when the OFF Switch is used to stop the engine Programming KeysOperator Control Panel Manual Start/StopAutomatic Start/Stop Automatic Fault Shutdown Automatic Mains Failure AMFUtility Normal Condition Utility Power Failure ConditionsUtility Power Restored Load Test Push-button OperationNo Load Test Engine Controller Inputs & Outputs Analog Faults Crank RunSuch as Fuel Rack Solenoids or electronic governors Engine starter motorFront panel keypad push-button Are no active faultsAction Description Display Comments NormalOther time delay functions are Vab Displays the generators output voltage Phase system not applicableGenerator KVA Display Vbc Displays the generators output voltageBattery Voltage/Engine Speed Navigation Hints Main Menu Loop Voltage Calibration Procedure Repeat for each phase Span CalibrationDisplayed values Oil Pressure Engine Temperature & Oil Pressure CalibrationDisplays the type of calibration function UsedConfiguration Data Sheet Main Menu Loop Parameters Parameter Setting Volts A-B Fault Name Input Analog198 F Alarm Battery VoltageEngine Control Connections Operator Control Panel Analog Engine Controller Only 10 Analog Operator Control Panel11 9957N Analog Engine Controller Connections 12 A121H Analog Engine Controller Connections Service Garretson Model KN Fuel Valve Considerations GeneralInstallation Section Troubleshooting and Maintenance EngineProblems and Solutions General Troubleshooting GuideTroubleshooting Guide Digital Controller Only Troubleshooting Guide Analog Controller Only Verify the adjustments. Replace controller if failedSpeed Part number DIODE, 1N5408Replacement Parts GLC GLC125LAMP, #67, 12 Volt Flywheel Housing Magnetic Pickup Cable Jam NutGLC Circuit Breaker & Electrical Data FLAGLC Data 259 300 MN2408 Series GLC A-7 144 150 GLC Wire Size Figure A-2 Customer Interface Connection Diagram MN2408 Series GLC A-11 Figure A-4 Single Phase w/o Breaker Connection Diagram Figure A-5 Single Phase One Breaker Connection Diagram Figure A-6 Single Phase Two Breaker Connection Diagram MN2408 Series GLC A-15 Series GLC MN2408 MN2408 Series GLC A-17 Series GLC MN2408 Figure A-11 Three Phase Connection Diagram Figure A-12 Three Phase Connection Diagram with PMG MN2408 Series GLC A-21 Series GLC MN2408 MN2408 Series GLC A-23 Series GLC MN2408 MN2408 Series GLC A-25 Series GLC MN2408 MN2408 Series GLC A-27 Figure A-20 Control Box Connections with MEC2 Controller Figure A-21 Engine Wiring, Woodward 4.3L GM Figure A-22 Engine Wiring, Woodward 5.7L GM Figure A-23 Engine Wiring, Woodward 8.1L GM Series GLC MN2408 Standby Continuous PowerName Address Phone Model Number Job Number No LoadAre legible Adjust the AC voltage to match the normal sourceSwitch Proper belt alignment and tensionsBaldor District Offices Baldor Electric Company MN2408 04 FAR200