Baldor GLC125, GLC35, GLC80, GLC50 manual MN2408 Series GLC A-23

Page 99

Figure A-15 Three Phase Connection Diagram (Wire 1/0 and Smaller w/Breaker)

MN2408

Series GLC A-23

Image 99
Contents GLC Generator California Proposition 65 Warning Table of Contents Appendix a Generator AC Metering Engine Parameter DisplayRead This Manual Thoroughly Section Product Safety InformationOperation SymbolsOperation Warning Statements Burn Installation Maintenance Product Safety Information MN2408 Limited Warranty Warranty PeriodLabor Parts General Information MN2408 Site Planning Installation GuidelinesRoom Air Controls and Transfer SwitchEngine Cooling System Exhaust SystemFoundation Design Foundation Checklist Setting The Genset On An Existing Concrete Floor SlabVibration Isolators Approximate Weight vs. kW Output Weight Of The GensetCalculate Soil Bearing Load SBL Capacity Designing An Isolated FoundationApproximate Load Bearing Capacities of Various Soil Types Typical Foundation InstallationLevel Of Attenuation Exhaust System Exhaust ChecklistSystem Placement Multi-Engine InstallationsExhaust System Calculations Exhaust Piping Radiator Cooling Cooling System Cooling System ChecklistHeat Exchanger Cooling System DeterminationCooling System Design Engine Mounted Radiator Cooling Remote Radiator Cooling Hot Well Installations11 Valves & Fittings and Fluid Flow in Pipe Other Considerations 13 Coolant Mixture Wind Barrier Air System Air System ChecklistEngine Crankcase Ventilation Transfer Switch Location Transfer Switch Transfer Switch ChecklistBattery Location Battery Starting SystemBattery Cables Battery ChargerGeneral Information MN2408 Generator Lifting When the Generator is installed outdoorsGenerator Mounting Mounting DimensionsVentilation Test Secure the GeneratorHot Exhaust Gasses Backpressure must not exceed 20 of water columnGuidelines for Exhaust System Page Fuel Connections Fuel Consumption Natural and LPGGeneral Considerations Example Determining Pipe Size for Natural Gas Natural Gas ConnectionsNatural Gas Flow Rate Cubic Feet per Hour per Pipe Length LP Gas Flow Rate Cubic Feet per Hour per Pipe Length Example Determining Pipe Size for LPGRating Transfer Switch ConsiderationsThree Phase WYE and Delta Connections Battery Charger Considerations General Wiring ConsiderationsFrame Ground Connection Page GLC125 Recommended Engine Oil and Battery TypePost Installation Checks GLC100Post Installation Checks Programming Keys Run SwitchOn when the OFF Switch is used to stop the engine Operator Control Panel Digital Engine Controller OnlyOperator Control Panel Manual Start/StopAutomatic Start/Stop Automatic Mains Failure AMF Automatic Fault ShutdownLoad Test Push-button Operation Utility Power Failure ConditionsUtility Power Restored Utility Normal ConditionNo Load Test Engine Controller Inputs & Outputs Analog Faults Engine starter motor RunSuch as Fuel Rack Solenoids or electronic governors CrankNormal Are no active faultsAction Description Display Comments Front panel keypad push-buttonOther time delay functions are Vbc Displays the generators output voltage Phase system not applicableGenerator KVA Display Vab Displays the generators output voltageBattery Voltage/Engine Speed Navigation Hints Main Menu Loop Voltage Calibration Procedure Repeat for each phase Span CalibrationDisplayed values Used Engine Temperature & Oil Pressure CalibrationDisplays the type of calibration function Oil PressureConfiguration Data Sheet Main Menu Loop Parameters Battery Voltage Fault Name Input Analog198 F Alarm Parameter Setting Volts A-BEngine Control Connections 10 Analog Operator Control Panel Operator Control Panel Analog Engine Controller Only11 9957N Analog Engine Controller Connections 12 A121H Analog Engine Controller Connections Garretson Model KN Fuel Valve Considerations General ServiceInstallation Engine Section Troubleshooting and MaintenanceGeneral Troubleshooting Guide Problems and SolutionsTroubleshooting Guide Digital Controller Only Troubleshooting Guide Analog Controller Only Verify the adjustments. Replace controller if failedSpeed DIODE, 1N5408 Part numberReplacement Parts GLC GLC125LAMP, #67, 12 Volt Cable Jam Nut Flywheel Housing Magnetic PickupFLA GLC Circuit Breaker & Electrical DataGLC Data 259 300 MN2408 Series GLC A-7 144 150 GLC Wire Size Figure A-2 Customer Interface Connection Diagram MN2408 Series GLC A-11 Figure A-4 Single Phase w/o Breaker Connection Diagram Figure A-5 Single Phase One Breaker Connection Diagram Figure A-6 Single Phase Two Breaker Connection Diagram MN2408 Series GLC A-15 Series GLC MN2408 MN2408 Series GLC A-17 Series GLC MN2408 Figure A-11 Three Phase Connection Diagram Figure A-12 Three Phase Connection Diagram with PMG MN2408 Series GLC A-21 Series GLC MN2408 MN2408 Series GLC A-23 Series GLC MN2408 MN2408 Series GLC A-25 Series GLC MN2408 MN2408 Series GLC A-27 Figure A-20 Control Box Connections with MEC2 Controller Figure A-21 Engine Wiring, Woodward 4.3L GM Figure A-22 Engine Wiring, Woodward 5.7L GM Figure A-23 Engine Wiring, Woodward 8.1L GM Series GLC MN2408 No Load PowerName Address Phone Model Number Job Number Standby ContinuousProper belt alignment and tensions Adjust the AC voltage to match the normal sourceSwitch Are legibleBaldor District Offices Baldor Electric Company MN2408 04 FAR200