Baldor GLC125, GLC35, GLC80, GLC50 Battery Charger Considerations, General Wiring Considerations

Page 43

Battery Charger Considerations

1.Mount the battery charger on the generator or as close to the generator as possible.

2.If you mount the battery charger inside the building, mount it near the main breaker box or disconnect box.

3.If you mount the battery charger outside, you must protect it from the environment and the elements.

4.Do not mount the battery charger where flammable liquids or vapors are present.

General Wiring Considerations

1.When routing the interface wiring, do not route it up against anything that could cut or chafe the wiring. do not route the wire up against any hot or potentially hot object.

2.Make sure that all the electrical components (generator set, transfer switch, battery charger, etc.) share a common hard wired ground.

3.Check with your local building inspector to determine what you must do to comply with the local regulations for grounding of this type of permanent installation.

Frame Ground Connection

WARNING: Be sure the system is properly grounded before applying power. Do not apply AC power before you ensure that grounds are connected. Electrical shock can cause serious or fatal injury. NEC requires that the frame and exposed conductive surfaces (metal parts) be connected to an approved earth ground. Local codes may also require proper grounding of generator systems.

It is important for safety reasons that the Generator set, transfer switch and battery charger share a common Ground and neutral.

The NEC requires that the frame and exposed metal surfaces be at local ground reference potential to avoid electrical shock hazard. A local ground reference may require a driven earth ground conductor at the generator installation site. Make the ground connection as shown in Figure 3-5. Use the appropriate size wire as required by NEC and local codes.

Warning: Do not connect the generator output neutral to the frame or local ground. The generator output is isolated from ground. NEC and local codes require that the generator output remain isolated from local ground reference.

Figure 3-5 Frame Ground Connection

Nut

Washer

Ground Wire Lug

Washer

Earth Ground

Stud

Frame

1.Open the enclosure access panel door 2 ( Figure 3-2).

2.Connect the ground wire to the “earth ground” terminal shown in Figure 3-5. This ground is the local reference ground to ground the generator frame only.

MN2408

Receiving & Installation 3-11

Image 43
Contents GLC Generator California Proposition 65 Warning Table of Contents Appendix a Generator AC Metering Engine Parameter DisplayRead This Manual Thoroughly Section Product Safety InformationOperation SymbolsOperation Warning Statements Burn Installation Maintenance Product Safety Information MN2408 Warranty Period Limited WarrantyLabor Parts General Information MN2408 Site Planning Installation GuidelinesRoom Air Controls and Transfer SwitchEngine Cooling System Exhaust SystemSetting The Genset On An Existing Concrete Floor Slab Foundation Design Foundation ChecklistVibration Isolators Approximate Weight vs. kW Output Weight Of The GensetCalculate Soil Bearing Load SBL Capacity Designing An Isolated FoundationApproximate Load Bearing Capacities of Various Soil Types Typical Foundation InstallationLevel Of Attenuation Exhaust System Exhaust ChecklistSystem Placement Multi-Engine InstallationsExhaust System Calculations Exhaust Piping Radiator Cooling Cooling System Cooling System ChecklistCooling System Determination Heat ExchangerCooling System Design Engine Mounted Radiator Cooling Remote Radiator Cooling Hot Well Installations11 Valves & Fittings and Fluid Flow in Pipe Other Considerations 13 Coolant Mixture Wind Barrier Air System Air System ChecklistEngine Crankcase Ventilation Transfer Switch Location Transfer Switch Transfer Switch ChecklistBattery Location Battery Starting SystemBattery Cables Battery ChargerGeneral Information MN2408 Generator Lifting When the Generator is installed outdoorsGenerator Mounting Mounting DimensionsVentilation Test Secure the GeneratorBackpressure must not exceed 20 of water column Hot Exhaust GassesGuidelines for Exhaust System Page Fuel Consumption Natural and LPG Fuel ConnectionsGeneral Considerations Natural Gas Connections Example Determining Pipe Size for Natural GasNatural Gas Flow Rate Cubic Feet per Hour per Pipe Length LP Gas Flow Rate Cubic Feet per Hour per Pipe Length Example Determining Pipe Size for LPGRating Transfer Switch ConsiderationsThree Phase WYE and Delta Connections General Wiring Considerations Battery Charger ConsiderationsFrame Ground Connection Page GLC125 Recommended Engine Oil and Battery TypePost Installation Checks GLC100Post Installation Checks Programming Keys Run SwitchOn when the OFF Switch is used to stop the engine Operator Control Panel Digital Engine Controller OnlyManual Start/Stop Operator Control PanelAutomatic Start/Stop Automatic Mains Failure AMF Automatic Fault ShutdownLoad Test Push-button Operation Utility Power Failure ConditionsUtility Power Restored Utility Normal ConditionNo Load Test Engine Controller Inputs & Outputs Analog Faults Engine starter motor RunSuch as Fuel Rack Solenoids or electronic governors CrankNormal Are no active faultsAction Description Display Comments Front panel keypad push-buttonOther time delay functions are Vbc Displays the generators output voltage Phase system not applicableGenerator KVA Display Vab Displays the generators output voltageBattery Voltage/Engine Speed Navigation Hints Main Menu Loop Voltage Calibration Procedure Span Calibration Repeat for each phaseDisplayed values Used Engine Temperature & Oil Pressure CalibrationDisplays the type of calibration function Oil PressureConfiguration Data Sheet Main Menu Loop Parameters Battery Voltage Fault Name Input Analog198 F Alarm Parameter Setting Volts A-BEngine Control Connections 10 Analog Operator Control Panel Operator Control Panel Analog Engine Controller Only11 9957N Analog Engine Controller Connections 12 A121H Analog Engine Controller Connections Garretson Model KN Fuel Valve Considerations General ServiceInstallation Engine Section Troubleshooting and MaintenanceGeneral Troubleshooting Guide Problems and SolutionsTroubleshooting Guide Digital Controller Only Verify the adjustments. Replace controller if failed Troubleshooting Guide Analog Controller OnlySpeed DIODE, 1N5408 Part numberGLC GLC125 Replacement PartsLAMP, #67, 12 Volt Cable Jam Nut Flywheel Housing Magnetic PickupFLA GLC Circuit Breaker & Electrical DataGLC Data 259 300 MN2408 Series GLC A-7 144 150 GLC Wire Size Figure A-2 Customer Interface Connection Diagram MN2408 Series GLC A-11 Figure A-4 Single Phase w/o Breaker Connection Diagram Figure A-5 Single Phase One Breaker Connection Diagram Figure A-6 Single Phase Two Breaker Connection Diagram MN2408 Series GLC A-15 Series GLC MN2408 MN2408 Series GLC A-17 Series GLC MN2408 Figure A-11 Three Phase Connection Diagram Figure A-12 Three Phase Connection Diagram with PMG MN2408 Series GLC A-21 Series GLC MN2408 MN2408 Series GLC A-23 Series GLC MN2408 MN2408 Series GLC A-25 Series GLC MN2408 MN2408 Series GLC A-27 Figure A-20 Control Box Connections with MEC2 Controller Figure A-21 Engine Wiring, Woodward 4.3L GM Figure A-22 Engine Wiring, Woodward 5.7L GM Figure A-23 Engine Wiring, Woodward 8.1L GM Series GLC MN2408 No Load PowerName Address Phone Model Number Job Number Standby ContinuousProper belt alignment and tensions Adjust the AC voltage to match the normal sourceSwitch Are legibleBaldor District Offices Baldor Electric Company MN2408 04 FAR200