Baldor GLC35, GLC80, GLC50, GLC125 manual Example Determining Pipe Size for LPG

Page 40

Example: Determining Pipe Size for LPG

A generator has a 16Hp engine 60 feet from the supply. Determine the supply pipe size for Natural Gas fuel.

16 x 10,000 = 160,000 BTU’s / per hour for proper operation.

160, 000 + 63.5 cubic feet per hour. 2, 516

From Table 3-6, a 60 foot run requires a minimum 1” pipe at full engine load.

LP Gas Connections (vapor withdrawal only)

The LPG connections should only be made if your generator is setup to run on LPG. If it is setup to run on Natural Gas, contact your Baldor representative and do not continue with installation.

The incoming pressure must be 11 inches water column (6 oz. pressure).

Table 3-6 LP Gas Flow Rate (Cubic Feet per Hour) per Pipe Length

Pipe

 

 

 

 

 

Iron Pipe Size

 

 

 

 

 

Length

 

 

 

 

 

 

 

 

 

 

 

 

 

1/2

3/4

1

1–1/4

1–1/2

 

2

 

2–1/2

3

4

6

8

(Feet)

 

 

15

48

109

218

475

772

 

1570

 

2437

4115

8786

24497

50007

30

33

76

153

339

538

 

1127

 

1741

2975

6140

17325

35353

45

27

63

126

275

443

 

934

 

1456

2469

5001

14781

28865

60

24

54

110

241

386

 

817

 

1266

2184

4304

12236

25004

75

 

49

98

218

345

 

709

 

1108

1899

3798

10957

22345

90

 

44

89

196

310

 

633

 

987

1709

3482

10001

20414

105

 

41

83

180

285

 

582

 

905

1551

3228

9254

18895

120

 

 

76

171

266

 

544

 

848

1456

3038

8659

17673

150

 

 

69

153

241

 

494

 

772

1323

2754

7748

15825

180

 

 

63

142

222

 

456

 

709

1234

2532

7064

14432

210

 

 

58

130

202

 

418

 

652

1127

2342

6439

13356

240

 

 

 

120

190

 

393

 

614

1063

2209

6077

12405

270

 

 

 

113

180

 

367

 

576

1000

2057

5697

11780

300

 

 

 

108

171

 

345

 

544

943

1899

5381

11179

Note: Almost all operation problems are related to the installation techniques used.

Do Not guess, be sure pipe size is adequate for required flow rate.

1.Connect the proper size gas pipe at the input to the LP Gas regulator. Connect the LPG pipe line shown in Figure 3-3 using the correct size pipe for the required flow rate and length of pipe. Refer to Table 3-6 for pipe size. Be certain that all connections are sealed and no leaks are present. The installer must ensure that all gas connections comply with all building codes.

2.Verify Fuel Supply Pressure

Prior to initial operation of generator, verify that fuel system pressure is 11Water Column (6 oz. pressure) and fuel pipe sizes comply with Table 3-6.

3.Proceed to Electrical Connections.

3-8 Receiving & Installation

MN2408

Image 40
Contents GLC Generator California Proposition 65 Warning Table of Contents Generator AC Metering Engine Parameter Display Appendix aSection Product Safety Information Read This Manual ThoroughlySymbols OperationOperation Warning Statements Burn Installation Maintenance Product Safety Information MN2408 Warranty Period Limited WarrantyLabor Parts General Information MN2408 Installation Guidelines Site PlanningControls and Transfer Switch Engine Cooling SystemExhaust System Room AirSetting The Genset On An Existing Concrete Floor Slab Foundation Design Foundation ChecklistVibration Isolators Weight Of The Genset Approximate Weight vs. kW OutputDesigning An Isolated Foundation Calculate Soil Bearing Load SBL CapacityTypical Foundation Installation Approximate Load Bearing Capacities of Various Soil TypesExhaust System Exhaust Checklist System PlacementMulti-Engine Installations Level Of AttenuationExhaust System Calculations Exhaust Piping Cooling System Cooling System Checklist Radiator CoolingCooling System Determination Heat ExchangerCooling System Design Engine Mounted Radiator Cooling Hot Well Installations Remote Radiator Cooling11 Valves & Fittings and Fluid Flow in Pipe Other Considerations 13 Coolant Mixture Air System Air System Checklist Wind BarrierEngine Crankcase Ventilation Transfer Switch Transfer Switch Checklist Transfer Switch LocationBattery Starting System Battery LocationBattery Charger Battery CablesGeneral Information MN2408 When the Generator is installed outdoors Generator LiftingMounting Dimensions Generator MountingSecure the Generator Ventilation TestBackpressure must not exceed 20 of water column Hot Exhaust GassesGuidelines for Exhaust System Page Fuel Consumption Natural and LPG Fuel ConnectionsGeneral Considerations Natural Gas Connections Example Determining Pipe Size for Natural GasNatural Gas Flow Rate Cubic Feet per Hour per Pipe Length Example Determining Pipe Size for LPG LP Gas Flow Rate Cubic Feet per Hour per Pipe LengthTransfer Switch Considerations RatingThree Phase WYE and Delta Connections General Wiring Considerations Battery Charger ConsiderationsFrame Ground Connection Page Recommended Engine Oil and Battery Type Post Installation ChecksGLC100 GLC125Post Installation Checks Run Switch On when the OFF Switch is used to stop the engineOperator Control Panel Digital Engine Controller Only Programming KeysManual Start/Stop Operator Control PanelAutomatic Start/Stop Automatic Fault Shutdown Automatic Mains Failure AMFUtility Power Failure Conditions Utility Power RestoredUtility Normal Condition Load Test Push-button OperationNo Load Test Engine Controller Inputs & Outputs Analog Faults Run Such as Fuel Rack Solenoids or electronic governorsCrank Engine starter motorAre no active faults Action Description Display CommentsFront panel keypad push-button NormalOther time delay functions are Phase system not applicable Generator KVA DisplayVab Displays the generators output voltage Vbc Displays the generators output voltageBattery Voltage/Engine Speed Navigation Hints Main Menu Loop Voltage Calibration Procedure Span Calibration Repeat for each phaseDisplayed values Engine Temperature & Oil Pressure Calibration Displays the type of calibration functionOil Pressure UsedConfiguration Data Sheet Main Menu Loop Parameters Fault Name Input Analog 198 F AlarmParameter Setting Volts A-B Battery VoltageEngine Control Connections Operator Control Panel Analog Engine Controller Only 10 Analog Operator Control Panel11 9957N Analog Engine Controller Connections 12 A121H Analog Engine Controller Connections Service Garretson Model KN Fuel Valve Considerations GeneralInstallation Section Troubleshooting and Maintenance EngineProblems and Solutions General Troubleshooting GuideTroubleshooting Guide Digital Controller Only Verify the adjustments. Replace controller if failed Troubleshooting Guide Analog Controller OnlySpeed Part number DIODE, 1N5408GLC GLC125 Replacement PartsLAMP, #67, 12 Volt Flywheel Housing Magnetic Pickup Cable Jam NutGLC Circuit Breaker & Electrical Data FLAGLC Data 259 300 MN2408 Series GLC A-7 144 150 GLC Wire Size Figure A-2 Customer Interface Connection Diagram MN2408 Series GLC A-11 Figure A-4 Single Phase w/o Breaker Connection Diagram Figure A-5 Single Phase One Breaker Connection Diagram Figure A-6 Single Phase Two Breaker Connection Diagram MN2408 Series GLC A-15 Series GLC MN2408 MN2408 Series GLC A-17 Series GLC MN2408 Figure A-11 Three Phase Connection Diagram Figure A-12 Three Phase Connection Diagram with PMG MN2408 Series GLC A-21 Series GLC MN2408 MN2408 Series GLC A-23 Series GLC MN2408 MN2408 Series GLC A-25 Series GLC MN2408 MN2408 Series GLC A-27 Figure A-20 Control Box Connections with MEC2 Controller Figure A-21 Engine Wiring, Woodward 4.3L GM Figure A-22 Engine Wiring, Woodward 5.7L GM Figure A-23 Engine Wiring, Woodward 8.1L GM Series GLC MN2408 Power Name Address Phone Model Number Job NumberStandby Continuous No LoadAdjust the AC voltage to match the normal source SwitchAre legible Proper belt alignment and tensionsBaldor District Offices Baldor Electric Company MN2408 04 FAR200