Vent system chart - 0 ft (0 m) to 10 ft (3.0 m)
_ssss/_ |
|
|
|
|
|
No. of | 0 | ft | Length of flexible metal vent | ||
turns or | (0 | m) | m) | ||
elbows |
|
|
|
|
|
3.Run vent to dryer location. Use the straightest path possible. See "Determine vent path" in "Plan Vent System." Avoid 90 ° turns. Use clamps to seal all joints. Do not use duct tape, screws or other fastening devices that extend into the interior of the vent to secure vent.
0 | 120 | ft | 105 |
| ft | 90 ft |
|
| (36.6 | m) | (32.0 | m) | (27.4 | m) | |
1 | 110 | ft | 95 | ft |
| 80 ft |
|
| (33.5 | m) | (29.0 | m) | (24.4 | m) | |
2 | 100 | ft | 85 | ft |
| 70 ft |
|
| (30.5 | m) | (25.9 | m) | (21.3 | m) | |
3 | 9O ff |
| 75 | ft |
| 6O ft |
|
| (27.4 | m) | (22.9 | m) | (18.3 | m) | |
4 | 8O ff |
| 65 | ft |
| 5O ft |
|
| (24.4 | m) | (19.8 | m) | (15.2 | m) | |
5 | 7O ff |
| 55 | ft |
| 4O ft |
|
| (21.3 | m) | (16.8 | m) | (12.2 | m) |
Vent system chart - 11 ft (3.4 m) to 25 ft (7.6 m)
No. | of | ft | ft | ft | ||||
turns | or | |||||||
elbows |
|
|
|
|
|
|
| |
0 |
| 75 ff |
| 60 | ff |
| 45 ff |
|
|
| (22.9 | m) | (18.3 | m) | (13.7 | m) | |
1 |
| 65 fl |
| 50 | ff |
| 35 ff |
|
|
| (19.8 | m) | (15.2 | m) | (10.7 | m) | |
2 |
| 55 ff |
| 40 | ff |
| 25 ff |
|
|
| (16.8 | m) | (12.2 | m) | (7.6 | m) | |
3 |
| 45ff |
| 30ff |
|
| 15ff |
|
|
| (13.7 | m) | (9.1 |
| m) | (4.6 | m) |
4 |
| 35 ff |
| 20 | ff |
| 5 ff |
|
|
| (10.7 | m) | (6.1 |
| m) | (1.5 | m) |
5 |
| 25fl |
| 10ff |
|
| Off |
|
|
| (7.6 | m) | (3.0 |
| m) | (0 m) |
Length of rigid metal vent
Length of flexible metal vent
Length of rigid metal vent
Excessive Weight Hazard
Use two or more people to move and install dryer.
Failure to do so can result in back or other injury.
1.[b protect the floor, use a large, flat piece of cardboard from the dryer carton. Place cardboard under the entire back side of the dryer.
2.Firmly grasp the body of the dryer (not the top or console panel). Gently lay the dryer on the cardboard. See illustration.
3.Examine the leveling legs. Find the diamond marking.
4.Screw the legs into the leg holes by hand. Use a wrench to finish turning the legs until the diamond marking is no longer visible.
5.Place a carton corner post from dryer packaging under each of the 2 dryer back corners. Stand the dryer up. Slide the dryer on the corner posts until it is close to its final location. Leave enough room to connect the exhaust vent.
1. | Using a 4" | (10.2 | cm) clamp, | connect | vent | to | exhaust | outlet in | dryen | If connecting | to | ||||||||
| existing vent, make sure the vent is clean. [he dryer vent must fit over the dryer exhaust | ||||||||||||||||||
| outlet | and | inside | the exhaust | hood. | Check | that | the | vent | is secured | to exhaust hood | with a | |||||||
| 4" (10.2 | cm) clamp. |
|
|
|
|
|
|
|
|
|
|
|
|
|
| |||
2. | Move | dryer | into | its final | location. | Do | not | crush | or | kink | vent. |
|
|
|
| ||||
3. | (On | gas | models) | Check | that | there | are | no | kinks | in the | flexible | gas | line. |
| |||||
4. | Once | the exhaust | vent | connection | is made, | remove |
| the | corner | posts | and cardboard. |
|
1.Install exhaust hood. Use caulking compound to seal exterior wall opening around exhaust hood.
2.Connect vent to exhaust hood. Vent must fit inside exhaust hood. Secure vent to exhaust hood with 4" (10.2 cm) clamp.