Middleby Marshall Model PS536 installation manual VI. Electrical Supply, VII. GAS Supply

Page 13

SECTION 2 - INSTALLATION

VI. ELECTRICAL SUPPLY

WARNING

Authorized supplier personnel normally accomplish the connections for the ventilation system, electric supply, and gas supply, as arranged by the customer. Following these connections, the factory-authorized installer can perform the initial startup of the oven.

NOTE: The electric supply installation must satisfy the requirements of the appropriate statutory authority, such as the National Electrical Code (NEC), ANSI/NFPA70, (U.S.A.); the Canadian Electrical Code, CSA C22.2; the Australian Code, AG601; or other applicable regulations.

NOTE: The electric supply connection must meet all national and local electrical code requirements.

Check the oven serial plate before making any electric supply connections. Electric supply connections must agree with data on the oven serial plate. The location of the serial plate is shown in Figure 1-1 (in Section 1, Description).

A fused disconnect switch or a main circuit breaker (customer furnished) MUST be installed in the electric supply line for each oven cavity. It is recommended that this switch/circuit breaker have lockout/tagout capability.

The supply conductors must be of the size and material (copper) recommended. Refer to the wiring diagram inside the machinery compartment of the oven. Electrical specifications are also listed on the oven's serial plate and in Tables 1-3 and 1-4, Elec- trical Specifications (in Section 1, Description).

The oven requires a ground connection to the oven ground screw located in the electrical junction box. (The box is shown in Figure 2-13.) If necessary, have the electrician supply the ground wire. Do NOT use the wiring conduit or other piping for ground connections!

A.Additional Information - Gas Ovens

B.Additional Information - Electric Ovens

A 1.3" (33mm) dia. cutout in the back wall of the machinery compartment provides access to the electrical supply connections. The actual wiring connections are made at the terminal block located in the electrical junction box.

Using flexible cables for the electric power supply conductors requires a 1.3" (33mm) strain-relief fitting (not furnished with the oven) to enable safe access to the terminal block.

C.Connection

Refer to the wiring diagram inside the machinery compartment of the oven to determine the correct connections for the electrical supply lines. Connect the supply as indicated on the wiring diagram.

Figure 2-13 - Utility connection locations

Electrical

Junction Box

ENGLISH

All electric supply connections are made at the terminal block located in the electrical junction box, shown in Figure 2-13. The power lines then connect to the oven circuits through a safety switch located inside the machinery compart- ment. This switch interrupts electric power to the oven when the Machinery Compartment Access Panel is opened.

1.3" (33mm) cutout for electric utility connection (electric ovens only)

1/2" NPT pipe for gas

utility connection (gas ovens only)

VII. GAS SUPPLY

CAUTION

3. If incoming pressure is over 14” W.C. (35mbar), a sepa-

DURINGPRESSURETESTINGNOTEONEOFTHEFOLLOWING:

rate regulator MUST be installed in the line BEFORE the

1. The oven and its individual shutoff valve must be discon-

individual shutoff valve for the oven.

WARNING: To prevent damage to the control valve regula-

nected from the gas supply piping system during any

pressure testing of that system at test pressure in excess

tor during initial turn- on of gas, it is very important to open

of 1/2 psi (3.45 kPa).

the manual shutoff valve very slowly.

2. The oven must be isolated from the gas supply piping

After the initial gas turn-on, the manual shutoff valve must

system by closing its individual manual shutoff valve dur-

remain open except during pressure testing as outlined in

ing any pressure testing of the gas supply piping system at

the above steps or when necessary during service main-

test pressure equal to or less than 1/2 psi (3.45 kPa).

tenance.

 

 

13

Image 13
Contents PS536 Gas and Electric Ovens English Table of Contents Description III. Oven SpecificationsOven Uses II. Oven Components see FigureElectrical specifications for electric ovens per oven cavity Installation Installation Kit Installation KIT see FigureRequirements II. Ventilation SystemRecommendations Other ventilation concernsTop panel and base pad installation III. AssemblyStacking Restraint Cable InstallationAssembling and tensioning the conveyor Conveyor Installation10 Conveyor placement Final AssemblyVI. Electrical Supply DuringpressuretestingnoteoneofthefollowingVII. GAS Supply Gas Conversion Gas Utility Rough-In RecommendationsLocation and Description of Controls OperationDailystartupprocedure If the oven uses this Digital Temperature ControllerII. Normal Operation STEP-BY-STEP For DailyshutdownprocedureLight III. Quick Reference Digital Temperature ControllersOvertemp SP LockActual Symptom IV. Quick Reference TroubleshootingMaintenance Daily MaintenanceIII. Maintenance Every 3 Months II. Maintenance MonthlySplit Belt Disassembly and Cleaning Disassembling the drive shaft KEY Spare Parts KIT Available sepa- rately. See Figure IV. Maintenance Every 6 MonthsBlower Belt Lubricating the Blower Fan BearingsWiring diagram, PS536 Gas Oven 208/230V, 60 Hz, 1 Ph Electrical Wiring DiagramsWiring diagram, PS536 Electric Oven 208/230V, 60 Hz, 3 Ph Wiring diagram, PS536 Electric Oven 380V, 50 Hz, 3 Ph English Français Fours électriques et à gaz, modèle PS536 Avertissement Fonctionnement Table DES MatièresEntretien Schémas DE CâblageII. Composants DU Four Figure Utilisations DU FourIII. Spécifications DU Four Neut., 1 masse Mise EN Garde Trousse d’installation Trousse D’INSTALLATION FigureII. Système DE Ventilation RecommandationsAutres considérations pour la ventilation Panneau supérieur et plaque de pose III. AssemblageSuperposition Installation du câble de retenueAssemblage et ajustement de tension du Transporteur Installation du transporteurAssemblage Final 10 Placement du transporteurVII. Alimentation EN GAZ VI. Alimentation EN ÉlectricitéDURANTL’ESSAIDEPRESSION,NOTEZCEQUISUIT 14 Installation du tuyau à gaz flexible Fonctionnement Emplacement ET Description DES CommandesProcédurequotidiennedemiseenmarche II. Fonctionnement Normal PAS-À-PASPROCÉDUREQUOTIDIENNEDEMISEÀL’ARRÊT AttendezAffichage du « Overtemp » Lock »Temp » Symptôme IV. Consultation Rapide Résolution DE ProblèmesAvertissement EntretienMise EN Garde RemarqueIII. Entretien Trimestriel II. Entretien MensuelDémontage de l’arbre d’entraînement IV. Entretien Semestriel Schéma de câblage, Four à gaz PS536 208/230 V, 60 Hz, 1 Ph Schémas DE CâblageSchémas DE Câblage Schéma de câblage, Four électrique PS536 380 V, 50 Hz, 3 Ph Anglais Français Espagnol Hornos de Gas y Eléctricos PS536 Aviso Índice SECCIÓN5-DIAGRAMASDELCABLEADOELÉCTRICOSección 3 Operación Sección 4 MantenimientoIII. Especificaciones DEL Horno SECCIÓN1DESCRIPCIÓNImportante Precaución Sección 2 InstalaciónJuego de Instalación Juego DE Instalación ver FiguraII. Sistema DE Ventilación Otros problemas de ventilaciónRequisitos RecomendacionesConjunto del panel superior y cojín de base III. EnsambladoPara hornos sencillos, pase al apartado C, Instalación del ApiladoCable de sujeción. Para hornos dobles o triples, continúe Con el paso 1 descrito a continuaciónFigura 2-8 Instalación y tensión del transportador Instalación del TransportadorFigura 2-10 Colocación del transportador Ensamblado FinalVII. Suministro DE GAS Precaución VI. Suministro EléctricoDurantelaspruebasdepresiónobservelosiguiente Conversión Según el Tipo de Gas ConexiónUbicación Y Descripción DE LOS Controles Sección 3 OperaciónSi el horno usa un controlador digital de la temperatura II. Operaciones Normales Paso a PasoProcedimientodiariodeencendido Procedimientodiariodeapagado ImportanteIII. Referencia Rápida Controlador Digital DE Temperatura LuzTemp LockSíntoma IV. Referencia Rápida Diagnóstico DE AveríasAviso SECCIÓN4-MANTENIMIENTONota Mantenimiento DiarioIII. Mantenimiento Trimestral II. Mantenimiento MensualFigura 4-5 Desensamble del eje impulsor Figura 4-6 Acceso al panel posterior IV. Mantenimiento SemestralSolamente Para LOS Hornos DE Banda Doble Sección 5 Diagramas DEL Cableado EléctricoSección 5 Diagramas DEL Cableado Eléctrico Contactor Fases English Français