Middleby Marshall Model PS536 installation manual English

Page 2

ENGLISH

NOTICE:

This Owner's Operating and Installation Manual should be given to the user. The operator of the oven should be familiar with the functions and operation of the oven.

This manual must be kept in a prominent, easily reachable location near the oven.

Gas ovens are designed for use with EITHER natural gas OR liquid propane gas, as specified on the serial plate. Where permitted by local and national codes, the oven can be converted from natural gas to propane operation, or from propane to natural gas operation. This conversion requires the installation of the appropriate Middleby Marshall Gas Conversion Kit by an Authorized Service Agent.

It is suggested to obtain a service contract with a Middleby Marshall Authorized Service Agent.

WARNING

POST, IN A PROMINENT LOCATION, THE EMERGENCY TELEPHONE NUMBER OF YOUR LOCAL GAS

SUPPLIER AND INSTRUCTIONS TO BE FOLLOWED IN THE EVENT YOU SMELL GAS.

Instructions to be followed in the event the user smells gas shall be obtained by consulting the local gas supplier. If the smell of gas is detected, immediately call the emergency phone number of your local Gas Company. They will have personnel and provisions available to correct the problem.

FOR YOUR SAFETY

Do not store or use gasoline or other flammable vapors or liquids in the vicinity of

this or any other appliance.

WARNING:

Improper installation, adjustment, alteration, service or maintenance can cause property damage, injury or death. Read the installation, operating and maintenance instructions thoroughly before installing or servicing this equipment.

IMPORTANT

An electrical wiring diagram for the oven is located inside the machinery

compartment.

IMPORTANT

It is the customer's responsibility to report any concealed or non-concealed damage

to the freight company. Retain all shipping materials until it is certain that the

equipment has not suffered concealed shipping damage.

NOTICE: CONTACT YOUR MIDDLEBY MARSHALL AUTHORIZED SERVICE AGENT TO PERFORM MAINTENANCE AND REPAIRS. AN AUTHORIZED SERVICE AGENCY DIRECTORY IS SUPPLIED WITH YOUR OVEN.

NOTICE: Using any parts other than genuine Middleby Marshall factory manufactured parts relieves the manufacturer of all warranty and liability.

NOTICE: Middleby Marshall (Manufacturer) reserves the right to change specifications at any time.

NOTICE: The equipment warranty is not valid unless the oven is installed, started and demonstrated under the supervision of a factory certified installer.

Retain This Manual For Future Reference

Middleby Cooking Systems Group • 1400 Toastmaster Drive • Elgin, IL 60120 • USA • (847)741-3300 • FAX (847)741-4406

24-Hour Service Hotline: 1-(800)-238-8444

www.middleby.com

2

Image 2
Contents PS536 Gas and Electric Ovens English Table of Contents Oven Uses III. Oven SpecificationsDescription II. Oven Components see FigureElectrical specifications for electric ovens per oven cavity Installation Installation KIT see Figure Installation KitRecommendations II. Ventilation SystemRequirements Other ventilation concernsIII. Assembly Top panel and base pad installationRestraint Cable Installation StackingConveyor Installation Assembling and tensioning the conveyorFinal Assembly 10 Conveyor placementVII. GAS Supply DuringpressuretestingnoteoneofthefollowingVI. Electrical Supply Gas Utility Rough-In Recommendations Gas ConversionOperation Location and Description of ControlsII. Normal Operation STEP-BY-STEP If the oven uses this Digital Temperature ControllerDailystartupprocedure Dailyshutdownprocedure ForIII. Quick Reference Digital Temperature Controllers LightActual SP LockOvertemp IV. Quick Reference Troubleshooting SymptomMaintenance Maintenance DailySplit Belt Disassembly and Cleaning II. Maintenance MonthlyIII. Maintenance Every 3 Months Disassembling the drive shaft Blower Belt IV. Maintenance Every 6 MonthsKEY Spare Parts KIT Available sepa- rately. See Figure Lubricating the Blower Fan BearingsElectrical Wiring Diagrams Wiring diagram, PS536 Gas Oven 208/230V, 60 Hz, 1 PhWiring diagram, PS536 Electric Oven 208/230V, 60 Hz, 3 Ph Wiring diagram, PS536 Electric Oven 380V, 50 Hz, 3 Ph English Français Fours électriques et à gaz, modèle PS536 Avertissement Entretien Table DES MatièresFonctionnement Schémas DE CâblageIII. Spécifications DU Four Utilisations DU FourII. Composants DU Four Figure Neut., 1 masse Mise EN Garde Trousse D’INSTALLATION Figure Trousse d’installationAutres considérations pour la ventilation RecommandationsII. Système DE Ventilation III. Assemblage Panneau supérieur et plaque de poseInstallation du câble de retenue SuperpositionInstallation du transporteur Assemblage et ajustement de tension du Transporteur10 Placement du transporteur Assemblage FinalDURANTL’ESSAIDEPRESSION,NOTEZCEQUISUIT VI. Alimentation EN ÉlectricitéVII. Alimentation EN GAZ 14 Installation du tuyau à gaz flexible Emplacement ET Description DES Commandes FonctionnementII. Fonctionnement Normal PAS-À-PAS ProcédurequotidiennedemiseenmarcheAttendez PROCÉDUREQUOTIDIENNEDEMISEÀL’ARRÊTAffichage du Temp » Lock »« Overtemp » IV. Consultation Rapide Résolution DE Problèmes SymptômeMise EN Garde EntretienAvertissement RemarqueII. Entretien Mensuel III. Entretien TrimestrielDémontage de l’arbre d’entraînement IV. Entretien Semestriel Schémas DE Câblage Schéma de câblage, Four à gaz PS536 208/230 V, 60 Hz, 1 PhSchémas DE Câblage Schéma de câblage, Four électrique PS536 380 V, 50 Hz, 3 Ph Anglais Français Espagnol Hornos de Gas y Eléctricos PS536 Aviso Sección 3 Operación SECCIÓN5-DIAGRAMASDELCABLEADOELÉCTRICOÍndice Sección 4 MantenimientoSECCIÓN1DESCRIPCIÓN III. Especificaciones DEL HornoImportante Sección 2 Instalación PrecauciónJuego DE Instalación ver Figura Juego de InstalaciónRequisitos Otros problemas de ventilaciónII. Sistema DE Ventilación RecomendacionesIII. Ensamblado Conjunto del panel superior y cojín de baseCable de sujeción. Para hornos dobles o triples, continúe ApiladoPara hornos sencillos, pase al apartado C, Instalación del Con el paso 1 descrito a continuaciónInstalación del Transportador Figura 2-8 Instalación y tensión del transportadorEnsamblado Final Figura 2-10 Colocación del transportadorDurantelaspruebasdepresiónobservelosiguiente VI. Suministro EléctricoVII. Suministro DE GAS Precaución Conexión Conversión Según el Tipo de GasSección 3 Operación Ubicación Y Descripción DE LOS ControlesProcedimientodiariodeencendido II. Operaciones Normales Paso a PasoSi el horno usa un controlador digital de la temperatura Importante ProcedimientodiariodeapagadoLuz III. Referencia Rápida Controlador Digital DE TemperaturaLock TempIV. Referencia Rápida Diagnóstico DE Averías SíntomaNota SECCIÓN4-MANTENIMIENTOAviso Mantenimiento DiarioII. Mantenimiento Mensual III. Mantenimiento TrimestralFigura 4-5 Desensamble del eje impulsor IV. Mantenimiento Semestral Figura 4-6 Acceso al panel posteriorSección 5 Diagramas DEL Cableado Eléctrico Solamente Para LOS Hornos DE Banda DobleSección 5 Diagramas DEL Cableado Eléctrico Contactor Fases English Français