Cabletron Systems 9A000 B.1.2 Running the Hardware Tests, SCP Diagnostics, B.1.2.1 Clock Test

Models: 9A000

1 180
Download 180 pages 32.99 Kb
Page 122
Image 122
B.1.2 Running the Hardware Tests

SCP Diagnostics

B.1.2 Running the Hardware Tests

This last portion from the displayed list is the group of hardware tests that the user can run on the SCP:

test-clock

- test Real Time Clock

test-dram

- test DRAM

test-dc <bank> <chip>

- test DRAM chip # <chip> in bank <bank>

test-ethernet

- test Ethernet

test-flash

- test Flash

test-fc <chip>

- test Flash chip <chip>

test-serial

- test Serial Port

test-sram

- test SRAM

test-timer

- test Timer

test-all

- test all devices, except Flash and SRAM

test-manufact

- test all devices

Type the test command at the prompt to run the individual test. A test that completes correctly will be reported as “OK” on both the terminal connected to the serial port and on the display LED on the front panel of the SCP. A test that is not successful will be reported as “failure” on the terminal connected to the serial port and as “BAD” on the display LED. If any of the tests fail, contact Cabletron Systems’ Technical Support.

The following subsections depict an example of how to perform each test through the serial port and the SCP’s confirmation message to the terminal connected to the serial port that the test was successful. The user input is in avant garde font and the SCP’s response is shown in courier font.

B.1.2.1 Clock Test

This test checks the real time clock to verify that it is ticking correctly. It takes about two seconds to run.

=>test-clock

Clock: OK

B.1.2.2 DRAM Test

This test checks the DRAM’s functionality. It takes about two seconds to run.

=>test-dram

DRAM: OK

B-4

Page 122
Image 122
Cabletron Systems 9A000 manual B.1.2 Running the Hardware Tests, SCP Diagnostics, B.1.2.1 Clock Test, B.1.2.2 DRAM Test