Workloads Panels

Workloads Panels

The next two figures show how you can access the realtime and near-term history panels for the objects from the Workloads portion of the System Status panel.

For realtime information, use the S (Show details) action code. For near-term history information, do the following:

verify that the online collector is running

enter the H (Historical) action code next to a monitored DB2 Subsystem component

For information about starting the online historical data collector, refer to the OMEGAMON II for DB2 Configuration and Customization Guide.

112 OMEGAMON II for DB2 User’s Guide: CUA Interface, Version 540

Page 112
Image 112
Candle-lite DB2 manual Workloads Panels