Installing the FN10
The table below describes some general considerations you should be aware of before mounting a FN10 in a rack assembly.
Table 2-3  General Considerations for Mounting a FN10
Consideration  | Discussion | |
  | 
  | |
  | Since the temperature within a rack assembly may  | |
  | be higher than the ambient room temperature,  | |
Temperature  | make sure the   | |
  | within the Operating Temperature range specified  | |
  | in Appendix A.  | |
  | 
  | |
  | Make sure there is at least 2 inches (or more) on  | |
Air Flow  | both sides of the FN10 to allow for adequate air  | |
  | flow.  | |
  | 
  | |
Mechanical Loading  | Do not place equipment on top of a   | |
FN10.  | ||
  | ||
  | 
  | |
Circuit Overloading  | Make sure the power supply circuit to the rack  | |
assembly is not overloaded.  | ||
  | ||
  | 
  | |
  | ||
Grounding (Earthing)  | addition to the direct connections to the main power  | |
supplies, make sure all the other supply  | ||
  | ||
  | connections are also grounded.  | |
  | 
  | 
The FN10 can be 
1. Attach the 
Fast Network 10 User Guide | Page   |