Installing the FN10

Rack-mounting an FN10

The table below describes some general considerations you should be aware of before mounting a FN10 in a rack assembly.

Table 2-3 General Considerations for Mounting a FN10

Consideration

Discussion

 

 

 

Since the temperature within a rack assembly may

 

be higher than the ambient room temperature,

Temperature

make sure the rack-environment temperature is

 

within the Operating Temperature range specified

 

in Appendix A.

 

 

 

Make sure there is at least 2 inches (or more) on

Air Flow

both sides of the FN10 to allow for adequate air

 

flow.

 

 

Mechanical Loading

Do not place equipment on top of a rack-mounted

FN10.

 

 

 

Circuit Overloading

Make sure the power supply circuit to the rack

assembly is not overloaded.

 

 

 

 

Rack-mounted equipment should be grounded. In

Grounding (Earthing)

addition to the direct connections to the main power

supplies, make sure all the other supply

 

 

connections are also grounded.

 

 

The FN10 can be rack-mounted in a standard 19-inch equipment cabinet. To mount the FN10 in a rack assembly, apply the following steps:

1. Attach the rack-mount brackets to either side of the FN10 chassis.

Fast Network 10 User Guide

Page 2-5

Page 35
Image 35
Enterasys Networks Fast Network 10 manual Installing the FN10