Chapter 5: Preparing for Router Installation

Table 53: Site Preparation Checklist (continued)

Item or Task

Performed By

Date

Notes

Plan the rack location, including required space clearances.

Secure the rack to the floor and the building structure.

Acquire appropriate cables and connectors.