Nortel Networks MICS-XC manual Re-Eval

Models: MICS-XC

1 138
Download 138 pages 24.91 Kb
Page 103
Image 103

 

 

Troubleshooting / 97

 

 

 

 

 

 

 

 

Example

Meaning

Possible causes and

display

 

actions

 

 

 

 

Alarm: 205

Disablement test active

 

 

 

 

 

 

Alarm: 206

Disablement test is

 

 

 

finished

 

 

 

 

 

 

Alarm: 207

System startup

System initialization is

 

 

beginning

 

 

 

 

Alarm: 208

System online

System initialization is

 

 

finished

 

 

 

 

Alarm: 209

Demo system

 

 

 

 

 

 

 

 

 

 

Re-Eval

System Re-evaluation

This message occurs when

required

required

a new Base Station is added

 

 

to the system or is moved to

 

 

a different port.

 

 

Run System Reevaluation

 

 

immediately or schedule a

 

 

System Reevaluation. See

 

 

“Re-evaluation” on page 63.

 

 

 

 

Re-Eval

System Re-evaluation

Base Station may have lost

recommended

recommended

power for longer than 3

 

 

minutes or was replaced

 

 

with a new Base Station.

 

 

You may

 

 

- run System Reevaluation

 

 

immediately

 

 

- schedule System

 

 

Reevaluation or

 

 

- CANCEL to disregard

 

 

message

 

 

See “Re-evaluation” on

 

 

page 63.

 

 

 

 

P0881594 Issue 01

MICS-XC Norstar-Companion Installer Guide

Page 103
Image 103
Nortel Networks MICS-XC manual Re-Eval